Finish Basement Cost Calculator

Finish Basement Cost Calculator & Guide :root { –primary-color: #004a99; –success-color: #28a745; –background-color: #f8f9fa; –text-color: #333; –border-color: #ddd; –card-background: #fff; –shadow: 0 2px 5px rgba(0,0,0,0.1); } body { font-family: 'Segoe UI', Tahoma, Geneva, Verdana, sans-serif; background-color: var(–background-color); color: var(–text-color); line-height: 1.6; margin: 0; padding: 0; } .container { max-width: 1000px; margin: 20px auto; padding: 20px; background-color: var(–card-background); border-radius: 8px; box-shadow: var(–shadow); } header { text-align: center; margin-bottom: 30px; padding-bottom: 20px; border-bottom: 1px solid var(–border-color); } header h1 { color: var(–primary-color); margin-bottom: 10px; } .calculator-section { margin-bottom: 40px; padding: 30px; border: 1px solid var(–border-color); border-radius: 8px; background-color: var(–card-background); box-shadow: var(–shadow); } .calculator-section h2 { color: var(–primary-color); text-align: center; margin-bottom: 25px; } .loan-calc-container { display: flex; flex-direction: column; gap: 20px; } .input-group { display: flex; flex-direction: column; gap: 8px; } .input-group label { font-weight: bold; color: var(–primary-color); } .input-group input[type="number"], .input-group select { padding: 12px; border: 1px solid var(–border-color); border-radius: 4px; font-size: 1rem; box-sizing: border-box; } .input-group input[type="number"]:focus, .input-group select:focus { outline: none; border-color: var(–primary-color); box-shadow: 0 0 0 2px rgba(0, 74, 153, 0.2); } .input-group .helper-text { font-size: 0.85rem; color: #666; } .error-message { color: #dc3545; font-size: 0.85rem; margin-top: 5px; display: none; /* Hidden by default */ } .button-group { display: flex; gap: 10px; margin-top: 20px; justify-content: center; flex-wrap: wrap; } button { padding: 12px 25px; border: none; border-radius: 5px; cursor: pointer; font-size: 1rem; font-weight: bold; transition: background-color 0.3s ease; } .btn-primary { background-color: var(–primary-color); color: white; } .btn-primary:hover { background-color: #003366; } .btn-secondary { background-color: #6c757d; color: white; } .btn-secondary:hover { background-color: #5a6268; } .btn-success { background-color: var(–success-color); color: white; } .btn-success:hover { background-color: #218838; } #results { margin-top: 30px; padding: 25px; border: 1px solid var(–border-color); border-radius: 8px; background-color: var(–card-background); box-shadow: var(–shadow); text-align: center; } #results h3 { color: var(–primary-color); margin-bottom: 20px; } .result-item { margin-bottom: 15px; font-size: 1.1rem; } .result-item strong { color: var(–primary-color); } .primary-result { font-size: 1.8rem; font-weight: bold; color: var(–success-color); background-color: #e9f7ef; padding: 15px; border-radius: 5px; margin-bottom: 20px; display: inline-block; } .formula-explanation { font-size: 0.9rem; color: #555; margin-top: 15px; padding-top: 15px; border-top: 1px dashed var(–border-color); } table { width: 100%; border-collapse: collapse; margin-top: 20px; margin-bottom: 30px; box-shadow: var(–shadow); } th, td { padding: 12px 15px; text-align: left; border: 1px solid var(–border-color); } thead { background-color: var(–primary-color); color: white; } tbody tr:nth-child(even) { background-color: #f2f2f2; } caption { font-size: 1.1rem; font-weight: bold; color: var(–primary-color); margin-bottom: 10px; text-align: left; } canvas { display: block; margin: 20px auto; max-width: 100%; border: 1px solid var(–border-color); border-radius: 4px; } .chart-legend { text-align: center; margin-top: 10px; font-size: 0.9rem; color: #555; } .chart-legend span { display: inline-block; margin: 0 10px; } .chart-legend .color-box { display: inline-block; width: 12px; height: 12px; margin-right: 5px; vertical-align: middle; } .article-section { margin-top: 40px; padding-top: 30px; border-top: 1px solid var(–border-color); } .article-section h2, .article-section h3 { color: var(–primary-color); margin-bottom: 15px; } .article-section h2 { font-size: 1.8rem; } .article-section h3 { font-size: 1.4rem; } .article-section p, .article-section ul, .article-section ol { margin-bottom: 15px; } .article-section ul, .article-section ol { padding-left: 25px; } .article-section li { margin-bottom: 8px; } .faq-item { margin-bottom: 15px; } .faq-item strong { display: block; color: var(–primary-color); cursor: pointer; margin-bottom: 5px; } .faq-item p { margin-left: 15px; font-size: 0.95rem; color: #555; } .internal-links ul { list-style: none; padding: 0; } .internal-links li { margin-bottom: 10px; } .internal-links a { color: var(–primary-color); text-decoration: none; font-weight: bold; } .internal-links a:hover { text-decoration: underline; } .internal-links span { display: block; font-size: 0.9rem; color: #666; margin-top: 3px; } .highlight { background-color: yellow; font-weight: bold; } @media (min-width: 768px) { .container { padding: 30px; } .calculator-section { padding: 40px; } .loan-calc-container { flex-direction: row; flex-wrap: wrap; justify-content: space-between; } .loan-calc-container .input-group { flex: 1 1 calc(50% – 10px); /* Two columns for inputs */ } .button-group { flex-direction: row; justify-content: center; } } @media (min-width: 992px) { .loan-calc-container .input-group { flex: 1 1 calc(33.333% – 15px); /* Three columns for inputs */ } }

Finish Basement Cost Calculator

Estimate the total cost to finish your basement project.

Basement Finishing Cost Estimator

Enter the total square footage of your basement.
Average cost for materials and labor ($20 – $300+).
Estimate for local building permits.
If hiring a designer or architect.
5% 10% 15% 20% Buffer for unexpected costs (recommended 10-20%).
e.g., specialized lighting, custom built-ins.

Estimated Basement Finishing Costs

$0
Base Project Cost: $0
Permits & Design: $0
Contingency Amount: $0
Total Estimated Cost: $0
Formula Used:
Base Project Cost = Square Footage * Cost Per Square Foot
Permits & Design = Permit Fees + Design Fees
Contingency Amount = (Base Project Cost + Permits & Design + Other Additional Costs) * (Contingency Percentage / 100)
Total Estimated Cost = Base Project Cost + Permits & Design + Other Additional Costs + Contingency Amount
Cost Breakdown Summary
Category Estimated Cost
Square Footage 0
Cost Per Square Foot $0
Base Project Cost $0
Permit & Inspection Fees $0
Design & Architectural Fees $0
Other Additional Costs $0
Contingency Fund $0
Total Estimated Cost $0

What is a Finish Basement Cost Calculator?

A finish basement cost calculator is an online tool designed to help homeowners estimate the potential expenses involved in transforming an unfinished basement into a functional and aesthetically pleasing living space. It takes into account various factors, such as the size of the basement, the quality of finishes desired, labor costs, and additional expenses like permits and design fees. This tool provides a crucial starting point for budgeting and financial planning for basement renovation projects.

Who should use it? Homeowners considering a basement finishing project, individuals seeking to understand the ROI of such a renovation, and those needing to establish a realistic budget before consulting contractors. It's particularly useful for comparing different levels of finish or understanding the impact of specific choices on the overall project cost.

Common misconceptions about basement finishing costs include underestimating the impact of unforeseen issues (like moisture problems or outdated electrical systems), assuming DIY labor significantly reduces costs without accounting for time and skill, and overlooking the importance of permits and inspections. Many also underestimate the variability in cost per square foot based on material choices and contractor rates.

Finish Basement Cost Calculator Formula and Mathematical Explanation

The core of the finish basement cost calculator relies on a series of calculations to arrive at a comprehensive estimate. The process breaks down the total cost into manageable components:

  1. Base Project Cost: This is the foundational cost, calculated by multiplying the total square footage of the basement by the estimated cost per square foot. This figure represents the direct cost of materials and labor for the basic finishing work (framing, drywall, flooring, basic electrical/plumbing).
  2. Permits & Design Costs: This component sums up the fixed or estimated costs for obtaining necessary building permits and any fees associated with hiring designers or architects to plan the space.
  3. Other Additional Costs: This category captures expenses beyond the standard finishes, such as custom cabinetry, specialized lighting fixtures, entertainment systems, or unique built-in features.
  4. Contingency Amount: A crucial element for any renovation, the contingency fund is calculated as a percentage of the subtotal (Base Project Cost + Permits & Design + Other Additional Costs). This buffer is essential for covering unexpected issues or changes during the project.
  5. Total Estimated Cost: This is the final figure, representing the sum of all the above components.

Variables Explained:

Variables Used in the Calculator
Variable Meaning Unit Typical Range
Basement Square Footage The total floor area of the basement to be finished. Square Feet (sq ft) 100 – 10,000+ sq ft
Estimated Cost Per Square Foot Average cost for materials and labor for standard finishes. USD ($) per sq ft $20 – $300+ / sq ft
Permit & Inspection Fees Costs associated with local government permits and inspections. USD ($) $100 – $5,000+
Design & Architectural Fees Costs for professional design services. USD ($) $0 – $10,000+
Contingency Percentage Percentage of the subtotal set aside for unexpected expenses. Percent (%) 5% – 20%
Other Additional Costs Expenses for non-standard features or upgrades. USD ($) $0 – $20,000+

Practical Examples (Real-World Use Cases)

Let's explore how the finish basement cost calculator can be used with practical scenarios:

Example 1: Standard Mid-Range Finish

A homeowner has a 1,200 sq ft unfinished basement. They plan a standard finish with mid-range materials (like laminate flooring, basic drywall, standard electrical outlets, and a simple bathroom). They estimate $70 per square foot for labor and materials. Local permits are expected to cost $600, and they won't be hiring a designer ($0). They want a 15% contingency fund. They anticipate $2,000 in additional costs for some built-in shelving.

  • Square Footage: 1,200 sq ft
  • Cost Per Sq Ft: $70
  • Permit Fees: $600
  • Design Fees: $0
  • Contingency Percentage: 15%
  • Additional Costs: $2,000

Calculation:

  • Base Project Cost: 1,200 * $70 = $84,000
  • Permits & Design: $600 + $0 = $600
  • Subtotal: $84,000 + $600 + $2,000 = $86,600
  • Contingency Amount: $86,600 * 0.15 = $12,990
  • Total Estimated Cost: $86,600 + $12,990 = $99,590

Interpretation: The estimated cost for this mid-range basement finish is approximately $99,590. This figure highlights the significant investment required, emphasizing the need for careful budgeting and potentially exploring financing options like a home equity loan.

Example 2: High-End Finish with Design Services

Another homeowner has a larger 1,800 sq ft basement. They desire a high-end finish, including hardwood floors, custom cabinetry, upgraded lighting, and a more complex layout. They estimate $120 per square foot. They hire an architect whose fees are $4,000, and permits cost $1,200. They opt for a 20% contingency fund and budget $5,000 for specialized features like a wet bar.

  • Square Footage: 1,800 sq ft
  • Cost Per Sq Ft: $120
  • Permit Fees: $1,200
  • Design Fees: $4,000
  • Contingency Percentage: 20%
  • Additional Costs: $5,000

Calculation:

  • Base Project Cost: 1,800 * $120 = $216,000
  • Permits & Design: $1,200 + $4,000 = $5,200
  • Subtotal: $216,000 + $5,200 + $5,000 = $226,200
  • Contingency Amount: $226,200 * 0.20 = $45,240
  • Total Estimated Cost: $226,200 + $45,240 = $271,440

Interpretation: This high-end finish comes with a substantial estimated cost of $271,440. This example demonstrates how premium finishes, professional design, and larger spaces dramatically increase the overall investment. Homeowners might consider options like a cash-out refinance to fund such a large project.

How to Use This Finish Basement Cost Calculator

Using the finish basement cost calculator is straightforward. Follow these steps to get your personalized cost estimate:

  1. Enter Basement Size: Input the total square footage of the area you intend to finish.
  2. Estimate Cost Per Square Foot: Research local contractor rates and material costs for your desired finish level (basic, mid-range, luxury). Enter this value. If unsure, start with a common range like $50-$100 and adjust based on your research.
  3. Add Permit & Design Fees: Input the estimated costs for local permits and any professional design services you plan to use. If you're doing it yourself without a designer, you can enter $0.
  4. Specify Other Costs: Include any known additional expenses like custom built-ins, specialized lighting, or home theater equipment.
  5. Select Contingency Percentage: Choose a percentage (typically 10-20%) to cover unforeseen expenses. A higher percentage offers more security for complex projects or older homes.
  6. Calculate: Click the "Calculate Costs" button.

Reading Your Results: The calculator will display the Base Project Cost, Permits & Design costs, Contingency Amount, and the Total Estimated Cost. The chart visually breaks down these components, and the table provides a detailed summary. Use these figures to understand the financial scope of your project.

Decision-Making Guidance: Compare the total estimated cost against your available funds or financing options. If the estimate exceeds your budget, consider adjusting the 'Cost Per Square Foot' (e.g., opting for less expensive materials), reducing 'Additional Costs', or lowering the 'Contingency Percentage' (though not recommended). You might also need to phase the project or seek additional funding, such as a personal loan for home improvement.

Key Factors That Affect Finish Basement Cost Results

Several critical factors influence the final cost of finishing a basement, impacting the accuracy of any finish basement cost calculator:

  1. Square Footage: The most significant driver. Larger basements naturally incur higher costs for materials, labor, and finishes.
  2. Quality of Finishes: This is a major variable. Opting for high-end materials like natural stone, custom hardwood, premium tile, and designer fixtures will dramatically increase the cost per square foot compared to basic laminate flooring, standard drywall, and builder-grade fixtures.
  3. Labor Costs: Rates vary significantly by geographic location and the demand for skilled tradespeople. Highly sought-after contractors may charge a premium. DIY labor can save money but requires significant time, skill, and tools.
  4. Scope of Work & Complexity: Adding features like wet bars, wine cellars, home theaters, multiple bedrooms, or complex plumbing/electrical layouts increases labor and material costs. The complexity of framing and the number of rooms also play a role.
  5. Permits and Regulations: Local building codes dictate requirements for egress windows, fire safety, plumbing, and electrical work. Obtaining permits involves fees and ensures compliance, but can add time and cost. Failure to obtain permits can lead to fines and costly remediation.
  6. Structural and Existing Conditions: Unforeseen issues like inadequate insulation, moisture problems (requiring waterproofing or remediation), outdated electrical panels, low ceiling heights, or the need for structural modifications (like adding support beams) can significantly inflate costs. A thorough inspection before starting is vital.
  7. Design and Architectural Fees: For complex layouts or high-end finishes, hiring a professional designer or architect is often necessary. Their fees can range from a few hundred to several thousand dollars, depending on the project's scope.
  8. Contingency Planning: Renovations rarely go exactly as planned. A contingency fund (typically 10-20% of the estimated cost) is essential to cover unexpected issues, material price fluctuations, or last-minute changes.

Frequently Asked Questions (FAQ)

Q1: What is a typical cost per square foot to finish a basement?

A: The typical range is broad, from $20-$50 per sq ft for very basic DIY finishes to $75-$150+ per sq ft for mid-range professional finishes, and $150-$300+ per sq ft for high-end, custom work. Our calculator uses a range of $20-$300 to reflect this.

Q2: Does finishing a basement add value to my home?

A: Yes, finishing a basement typically adds significant value, often recouping a large percentage of the renovation cost upon resale. It effectively adds usable living space, which is highly desirable.

Q3: How long does it take to finish a basement?

A: A professional finish can take anywhere from 4 to 12 weeks, depending on the size, complexity, contractor availability, and permit process. DIY projects can take much longer.

Q4: Should I get multiple quotes from contractors?

A: Absolutely. Getting at least 3 detailed quotes from reputable contractors is crucial. This helps ensure you're getting a competitive price and allows you to compare scope, materials, and timelines.

Q5: What are the most common hidden costs in basement finishing?

A: Common hidden costs include mold or water remediation, upgrading electrical panels, adding egress windows, unexpected structural work, and dealing with low ceiling heights. Always include a contingency fund.

Q6: Can I finish my basement myself to save money?

A: Yes, DIY finishing can save significantly on labor costs. However, it requires considerable time, skill, and knowledge of building codes. Consider hiring professionals for tasks like electrical and plumbing work where mistakes can be costly or dangerous.

Q7: What permits are usually required for finishing a basement?

A: Typically, permits are required for any work involving structural changes, plumbing, electrical, and HVAC. This often includes framing, drywall installation, and adding new rooms or bathrooms. Check with your local building department.

Q8: How does the contingency fund work?

A: The contingency fund is a percentage of your estimated project cost set aside for unexpected expenses. If you don't use it, you save money. If you do encounter unforeseen issues, it prevents budget overruns.

Q9: Can I finance a basement finishing project?

A: Yes, common financing options include home equity loans, home equity lines of credit (HELOCs), personal loans, or even refinancing your existing mortgage. The best option depends on your financial situation and equity.

var chartInstance = null; // Global variable to hold chart instance function validateInput(id, min, max, errorMessageId, isRequired = true) { var input = document.getElementById(id); var errorDiv = document.getElementById(errorMessageId); var value = parseFloat(input.value); errorDiv.style.display = 'none'; // Hide error by default if (isRequired && (input.value === null || input.value.trim() === ")) { errorDiv.textContent = "This field is required."; errorDiv.style.display = 'block'; return false; } if (isNaN(value)) { if (input.value.trim() !== ") { // Only show error if not empty but NaN errorDiv.textContent = "Please enter a valid number."; errorDiv.style.display = 'block'; } return false; } if (value max) { errorDiv.textContent = "Value cannot exceed " + max + "."; errorDiv.style.display = 'block'; return false; } return true; } function calculateCosts() { // Clear previous errors document.getElementById('squareFootageError').style.display = 'none'; document.getElementById('costPerSqFtError').style.display = 'none'; document.getElementById('permitFeesError').style.display = 'none'; document.getElementById('designFeesError').style.display = 'none'; document.getElementById('contingencyPercentageError').style.display = 'none'; document.getElementById('additionalCostsError').style.display = 'none'; // Validate inputs var isValid = true; isValid = validateInput('squareFootage', 100, 10000, 'squareFootageError') && isValid; isValid = validateInput('costPerSqFt', 20, 300, 'costPerSqFtError') && isValid; isValid = validateInput('permitFees', 0, 5000, 'permitFeesError') && isValid; isValid = validateInput('designFees', 0, 10000, 'designFeesError') && isValid; isValid = validateInput('additionalCosts', 0, 20000, 'additionalCostsError') && isValid; // Contingency percentage is a select, validation is implicit by its nature if (!isValid) { document.getElementById('primaryResult').textContent = '$0'; document.getElementById('baseCost').textContent = '$0'; document.getElementById('permitsDesignCost').textContent = '$0'; document.getElementById('contingencyAmount').textContent = '$0'; document.getElementById('totalEstimatedCost').textContent = '$0'; updateTable('0', '0', '0', '0', '0', '0', '0', '0'); updateChart(0, 0, 0, 0); return; } var sqFt = parseFloat(document.getElementById('squareFootage').value); var costPerSqFt = parseFloat(document.getElementById('costPerSqFt').value); var permitFees = parseFloat(document.getElementById('permitFees').value); var designFees = parseFloat(document.getElementById('designFees').value); var contingencyPercent = parseFloat(document.getElementById('contingencyPercentage').value); var additionalCosts = parseFloat(document.getElementById('additionalCosts').value); var baseCost = sqFt * costPerSqFt; var permitsDesign = permitFees + designFees; var subTotal = baseCost + permitsDesign + additionalCosts; var contingencyAmount = subTotal * (contingencyPercent / 100); var totalEstimatedCost = subTotal + contingencyAmount; // Format currency var formatter = new Intl.NumberFormat('en-US', { style: 'currency', currency: 'USD', minimumFractionDigits: 0, maximumFractionDigits: 0 }); document.getElementById('primaryResult').textContent = formatter.format(totalEstimatedCost); document.getElementById('baseCost').textContent = formatter.format(baseCost); document.getElementById('permitsDesignCost').textContent = formatter.format(permitsDesign); document.getElementById('contingencyAmount').textContent = formatter.format(contingencyAmount); document.getElementById('totalEstimatedCost').textContent = formatter.format(totalEstimatedCost); updateTable( sqFt, formatter.format(costPerSqFt), formatter.format(baseCost), formatter.format(permitFees), formatter.format(designFees), formatter.format(additionalCosts), formatter.format(contingencyAmount), formatter.format(totalEstimatedCost) ); updateChart(baseCost, permitsDesign, additionalCosts, contingencyAmount); } function updateTable(sqFt, costPerSqFtFormatted, baseCostFormatted, permitFeesFormatted, designFeesFormatted, additionalCostsFormatted, contingencyAmountFormatted, totalEstimatedCostFormatted) { document.getElementById('tableSqFt').textContent = sqFt; document.getElementById('tableCostPerSqFt').textContent = costPerSqFtFormatted; document.getElementById('tableBaseCost').textContent = baseCostFormatted; document.getElementById('tablePermitFees').textContent = permitFeesFormatted; document.getElementById('tableDesignFees').textContent = designFeesFormatted; document.getElementById('tableAdditionalCosts').textContent = additionalCostsFormatted; document.getElementById('tableContingencyAmount').textContent = contingencyAmountFormatted; document.getElementById('tableTotalEstimatedCost').textContent = totalEstimatedCostFormatted; } function updateChart(baseCost, permitsDesign, additionalCosts, contingencyAmount) { var ctx = document.getElementById('costBreakdownChart').getContext('2d'); // Destroy previous chart instance if it exists if (chartInstance) { chartInstance.destroy(); } var total = baseCost + permitsDesign + additionalCosts + contingencyAmount; var basePercentage = total > 0 ? (baseCost / total) * 100 : 0; var permitsDesignPercentage = total > 0 ? (permitsDesign / total) * 100 : 0; var additionalCostsPercentage = total > 0 ? (additionalCosts / total) * 100 : 0; var contingencyPercentage = total > 0 ? (contingencyAmount / total) * 100 : 0; var formatter = new Intl.NumberFormat('en-US', { style: 'currency', currency: 'USD', minimumFractionDigits: 0, maximumFractionDigits: 0 }); document.getElementById('legendBase').innerHTML = ' Base Cost (' + formatter.format(baseCost) + ')'; document.getElementById('legendPermitsDesign').innerHTML = ' Permits & Design (' + formatter.format(permitsDesign) + ')'; document.getElementById('legendAdditional').innerHTML = ' Additional Costs (' + formatter.format(additionalCosts) + ')'; document.getElementById('legendContingency').innerHTML = ' Contingency (' + formatter.format(contingencyAmount) + ')'; chartInstance = new Chart(ctx, { type: 'pie', data: { labels: ['Base Cost', 'Permits & Design', 'Additional Costs', 'Contingency'], datasets: [{ label: 'Cost Breakdown', data: [baseCost, permitsDesign, additionalCosts, contingencyAmount], backgroundColor: [ '#004a99', // Primary Blue '#6c757d', // Secondary Gray '#ffc107', // Warning Yellow '#28a745' // Success Green ], borderColor: '#ffffff', borderWidth: 1 }] }, options: { responsive: true, maintainAspectRatio: false, plugins: { legend: { display: false // Hide default legend, use custom one }, tooltip: { callbacks: { label: function(context) { var label = context.label || "; var value = context.raw || 0; return label + ': ' + formatter.format(value); } } } } } }); } function resetCalculator() { document.getElementById('squareFootage').value = 1000; document.getElementById('costPerSqFt').value = 75; document.getElementById('permitFees').value = 500; document.getElementById('designFees').value = 1000; document.getElementById('contingencyPercentage').value = 10; document.getElementById('additionalCosts').value = 1500; // Clear errors document.getElementById('squareFootageError').style.display = 'none'; document.getElementById('costPerSqFtError').style.display = 'none'; document.getElementById('permitFeesError').style.display = 'none'; document.getElementById('designFeesError').style.display = 'none'; document.getElementById('contingencyPercentageError').style.display = 'none'; document.getElementById('additionalCostsError').style.display = 'none'; calculateCosts(); // Recalculate with default values } function copyResults() { var primaryResult = document.getElementById('primaryResult').textContent; var baseCost = document.getElementById('baseCost').textContent; var permitsDesignCost = document.getElementById('permitsDesignCost').textContent; var contingencyAmount = document.getElementById('contingencyAmount').textContent; var totalEstimatedCost = document.getElementById('totalEstimatedCost').textContent; var sqFt = document.getElementById('squareFootage').value; var costPerSqFt = document.getElementById('costPerSqFt').value; var permitFees = document.getElementById('permitFees').value; var designFees = document.getElementById('designFees').value; var contingencyPercent = document.getElementById('contingencyPercentage').options[document.getElementById('contingencyPercentage').selectedIndex].text; var additionalCosts = document.getElementById('additionalCosts').value; var copyText = "— Basement Finishing Cost Estimate —" + "\n\n"; copyText += "Key Results:\n"; copyText += "- Primary Result (Total Estimated Cost): " + primaryResult + "\n"; copyText += "- Base Project Cost: " + baseCost + "\n"; copyText += "- Permits & Design Costs: " + permitsDesignCost + "\n"; copyText += "- Contingency Amount: " + contingencyAmount + "\n"; copyText += "- Total Estimated Cost: " + totalEstimatedCost + "\n\n"; copyText += "Assumptions/Inputs:\n"; copyText += "- Basement Square Footage: " + sqFt + " sq ft\n"; copyText += "- Estimated Cost Per Square Foot: $" + costPerSqFt + "\n"; copyText += "- Permit & Inspection Fees: $" + permitFees + "\n"; copyText += "- Design & Architectural Fees: $" + designFees + "\n"; copyText += "- Contingency Fund: " + contingencyPercent + "\n"; copyText += "- Other Additional Costs: $" + additionalCosts + "\n\n"; copyText += "Formula Used:\n"; copyText += "Base Project Cost = Square Footage * Cost Per Square Foot\n"; copyText += "Permits & Design = Permit Fees + Design Fees\n"; copyText += "Contingency Amount = (Base Project Cost + Permits & Design + Other Additional Costs) * (Contingency Percentage / 100)\n"; copyText += "Total Estimated Cost = Base Project Cost + Permits & Design + Other Additional Costs + Contingency Amount"; // Use a temporary textarea to copy text var textArea = document.createElement("textarea"); textArea.value = copyText; textArea.style.position = "fixed"; textArea.style.left = "-9999px"; document.body.appendChild(textArea); textArea.focus(); textArea.select(); try { var successful = document.execCommand('copy'); var msg = successful ? 'Results copied to clipboard!' : 'Failed to copy results.'; // Optionally show a temporary message to the user console.log(msg); } catch (err) { console.error('Unable to copy results', err); } document.body.removeChild(textArea); } // Initialize calculator on page load window.onload = function() { calculateCosts(); // Add event listeners for real-time updates var inputs = document.querySelectorAll('.loan-calc-container input, .loan-calc-container select'); for (var i = 0; i < inputs.length; i++) { inputs[i].addEventListener('input', calculateCosts); } }; // FAQ functionality document.addEventListener('DOMContentLoaded', function() { var faqItems = document.querySelectorAll('.faq-item strong'); for (var i = 0; i < faqItems.length; i++) { faqItems[i].addEventListener('click', function() { var p = this.nextElementSibling; if (p.style.display === 'block') { p.style.display = 'none'; } else { p.style.display = 'block'; } }); } }); // Load Chart.js library dynamically if not already present if (typeof Chart === 'undefined') { var script = document.createElement('script'); script.src = 'https://cdn.jsdelivr.net/npm/chart.js@3.7.0/dist/chart.min.js'; script.onload = function() { // Initial calculation after chart library is loaded calculateCosts(); }; document.head.appendChild(script); } else { // If Chart.js is already loaded, just calculate calculateCosts(); }

Leave a Comment