Tuffblock Calculator

TuffBlock Calculator – Estimate Material Needs & Costs :root { –primary-color: #004a99; –success-color: #28a745; –background-color: #f8f9fa; –text-color: #333; –border-color: #ddd; –shadow-color: rgba(0,0,0,0.1); –card-background: #fff; } body { font-family: 'Segoe UI', Tahoma, Geneva, Verdana, sans-serif; background-color: var(–background-color); color: var(–text-color); line-height: 1.6; margin: 0; padding: 0; } .container { max-width: 1000px; margin: 20px auto; padding: 20px; background-color: var(–card-background); border-radius: 8px; box-shadow: 0 2px 10px var(–shadow-color); display: flex; flex-direction: column; align-items: center; } h1, h2, h3 { color: var(–primary-color); text-align: center; } h1 { margin-bottom: 10px; } .calc-header { text-align: center; margin-bottom: 30px; } .calc-header h1 { font-size: 2.5em; margin-bottom: 5px; } .calc-header p { font-size: 1.1em; color: #555; } .loan-calc-container { width: 100%; max-width: 600px; padding: 25px; border: 1px solid var(–border-color); border-radius: 8px; background-color: var(–card-background); box-shadow: 0 1px 5px var(–shadow-color); margin-bottom: 30px; } .input-group { margin-bottom: 20px; width: 100%; } .input-group label { display: block; margin-bottom: 8px; font-weight: bold; color: var(–primary-color); } .input-group input[type="number"], .input-group select { width: calc(100% – 22px); padding: 10px; border: 1px solid var(–border-color); border-radius: 4px; font-size: 1em; box-sizing: border-box; } .input-group input[type="number"]:focus, .input-group select:focus { outline: none; border-color: var(–primary-color); box-shadow: 0 0 0 2px rgba(0, 74, 153, 0.2); } .input-group .helper-text { font-size: 0.85em; color: #666; margin-top: 5px; display: block; } .error-message { color: red; font-size: 0.9em; margin-top: 5px; display: none; /* Hidden by default */ } .error-message.visible { display: block; } .button-group { display: flex; justify-content: space-between; margin-top: 25px; gap: 10px; } .button-group button { padding: 12px 20px; border: none; border-radius: 5px; cursor: pointer; font-size: 1em; font-weight: bold; transition: background-color 0.3s ease; flex-grow: 1; } .button-group .calculate-btn { background-color: var(–primary-color); color: white; } .button-group .calculate-btn:hover { background-color: #003366; } .button-group .reset-btn { background-color: #6c757d; color: white; } .button-group .reset-btn:hover { background-color: #5a6268; } .button-group .copy-btn { background-color: var(–success-color); color: white; } .button-group .copy-btn:hover { background-color: #218838; } .results-container { margin-top: 30px; padding: 25px; border: 1px solid var(–border-color); border-radius: 8px; background-color: var(–card-background); box-shadow: 0 1px 5px var(–shadow-color); width: 100%; box-sizing: border-box; } .results-container h3 { margin-top: 0; color: var(–primary-color); border-bottom: 2px solid var(–primary-color); padding-bottom: 10px; margin-bottom: 20px; } .results-container .primary-result { font-size: 2.2em; font-weight: bold; color: var(–primary-color); text-align: center; background-color: #e0f0ff; padding: 15px; border-radius: 5px; margin-bottom: 20px; } .results-container .intermediate-results { display: grid; grid-template-columns: repeat(auto-fit, minmax(180px, 1fr)); gap: 15px; margin-bottom: 25px; } .results-container .intermediate-item { background-color: #f4f9ff; padding: 15px; border-radius: 5px; text-align: center; } .results-container .intermediate-item .label { font-size: 0.95em; color: #555; margin-bottom: 5px; } .results-container .intermediate-item .value { font-size: 1.5em; font-weight: bold; color: var(–primary-color); } .results-container .formula-explanation { font-size: 0.9em; color: #444; background-color: #f0f0f0; padding: 15px; border-radius: 5px; margin-top: 20px; } table { width: 100%; border-collapse: collapse; margin-top: 20px; box-shadow: 0 1px 5px var(–shadow-color); } th, td { padding: 12px 15px; text-align: left; border-bottom: 1px solid var(–border-color); } thead { background-color: var(–primary-color); color: white; } th { font-weight: bold; } tbody tr:nth-child(even) { background-color: #f8f8f8; } caption { caption-side: bottom; font-style: italic; color: #666; margin-top: 10px; font-size: 0.9em; text-align: center; } canvas { display: block; margin: 20px auto; background-color: var(–card-background); border-radius: 5px; box-shadow: 0 1px 5px var(–shadow-color); } .chart-caption { text-align: center; font-size: 0.9em; color: #555; margin-top: 5px; } .article-section { margin-top: 40px; padding-top: 30px; border-top: 1px solid var(–border-color); } .article-section h2 { text-align: left; margin-bottom: 15px; } .article-section h3 { text-align: left; margin-top: 20px; margin-bottom: 10px; color: #003366; } .article-section p, .article-section ul, .article-section ol { margin-bottom: 15px; font-size: 1em; } .article-section ul, .article-section ol { padding-left: 25px; } .article-section li { margin-bottom: 8px; } .article-section table { margin-top: 15px; } .article-section .faq-item { margin-bottom: 15px; } .article-section .faq-item strong { display: block; color: var(–primary-color); margin-bottom: 5px; } .article-section .internal-links-list li { margin-bottom: 10px; } .article-section .internal-links-list a { color: var(–primary-color); text-decoration: none; font-weight: bold; } .article-section .internal-links-list a:hover { text-decoration: underline; } .article-section .internal-links-list a span { font-size: 0.9em; color: #555; display: block; margin-top: 3px; } .primary-keyword { font-weight: bold; color: var(–primary-color); } .hidden { display: none; } .tooltip { position: relative; display: inline-block; cursor: help; border-bottom: 1px dotted #004a99; } .tooltip .tooltiptext { visibility: hidden; width: 200px; background-color: #555; color: #fff; text-align: center; border-radius: 6px; padding: 5px 0; position: absolute; z-index: 1; bottom: 125%; left: 50%; margin-left: -100px; opacity: 0; transition: opacity 0.3s; font-size: 0.85em; line-height: 1.4; } .tooltip .tooltiptext::after { content: ""; position: absolute; top: 100%; left: 50%; margin-left: -5px; border-width: 5px; border-style: solid; border-color: #555 transparent transparent transparent; } .tooltip:hover .tooltiptext { visibility: visible; opacity: 1; }

TuffBlock Calculator

Estimate materials and costs for your TuffBlock construction project.

Project Inputs

Enter the total length of the wall(s) in meters.
Enter the total height of the wall(s) in meters.
Standard TuffBlock width (e.g., 0.4m).
Standard TuffBlock height (e.g., 0.2m).
Standard TuffBlock length (e.g., 0.6m).
Estimated mortar needed for joining one block (e.g., 0.01 m²).
Estimated concrete needed to fill block cavities (e.g., 0.005 m³).
Enter the cost of a single TuffBlock.
Cost of mortar per cubic meter.
Cost of concrete per cubic meter.
Add a percentage for cuts, breakage, etc. (e.g., 5%).

What is a TuffBlock Calculator?

A TuffBlock calculator is a specialized online tool designed to help construction professionals, DIY enthusiasts, and project managers estimate the quantities of TuffBlocks, associated materials like mortar and concrete, and the overall cost for building projects using TuffBlock systems. TuffBlocks are interlocking concrete blocks known for their speed of assembly and thermal insulation properties, making them suitable for a variety of construction applications, from retaining walls to structural walls in residential and commercial buildings. This calculator simplifies the complex task of material estimation, providing accurate figures based on project dimensions and material costs.

Who Should Use a TuffBlock Calculator?

  • Builders and Contractors: To quickly quote projects, order materials, and manage budgets efficiently.
  • Architects and Engineers: To perform preliminary material take-offs and cost analyses during the design phase.
  • DIY Homeowners: Planning to build extensions, garden walls, or other structures with TuffBlocks, to understand material requirements and expenses.
  • Material Suppliers: To assist customers in determining their needs and provide accurate sales quotations.

Common Misconceptions about TuffBlock Projects

  • Underestimating Wastage: Many assume blocks will be used without loss. However, cuts, breakages, and handling can lead to significant wastage, which a good calculator accounts for.
  • Ignoring Cavity Filling: TuffBlocks often require cavities to be filled with concrete and rebar for structural integrity, especially for load-bearing walls. This cost and volume can be substantial.
  • Simplified Costing: Focusing only on the block cost and forgetting mortar, concrete, and labor can lead to inaccurate budget projections.
  • Over-reliance on Visual Estimates: Eyeballing dimensions is prone to error. A precise calculator ensures accurate material ordering, preventing costly over- or under-purchases.

TuffBlock Calculator Formula and Mathematical Explanation

The core of the TuffBlock calculator involves a series of calculations to determine material quantities and costs. It breaks down the estimation process into manageable steps:

Step-by-Step Derivation:

  1. Calculate Total Wall Area: The total surface area of the wall(s) to be built is determined first. This is crucial as it forms the basis for block quantity estimation.
  2. Determine Block Surface Area: The visible face area of a single TuffBlock is calculated.
  3. Calculate Blocks Needed Per Square Meter: By dividing 1 square meter by the Block Surface Area, we find out how many TuffBlocks are required to cover one square meter of wall.
  4. Calculate Total Blocks Required: The total wall area is multiplied by the blocks needed per square meter. A wastage factor is then added to account for potential losses.
  5. Calculate Mortar and Concrete Volumes: Based on the total number of blocks, the calculator estimates the required mortar for joints and concrete for filling block cavities.
  6. Calculate Material Costs: Each material's total required quantity is multiplied by its unit cost.
  7. Calculate Total Project Cost: The sum of the individual material costs provides the overall estimated project expense.

Variable Explanations:

The calculator utilizes several key variables:

  • Wall Length (L): The total linear measurement of the wall(s) in meters.
  • Wall Height (H): The vertical measurement of the wall(s) in meters.
  • TuffBlock Width (Wb): The width of a single TuffBlock in meters.
  • TuffBlock Height (Hb): The height of a single TuffBlock in meters.
  • TuffBlock Length (Lb): The length of a single TuffBlock in meters.
  • Mortar Coverage (Mc): The estimated volume or surface area of mortar used per block joint in square meters.
  • Concrete Volume per Block (Cv): The estimated volume of concrete required to fill the cavity of a single TuffBlock in cubic meters.
  • Block Cost: The price of a single TuffBlock.
  • Mortar Cost per m³: The cost of mortar per cubic meter.
  • Concrete Cost per m³: The cost of concrete per cubic meter.
  • Wastage Percentage (Wp): An additional percentage added to material quantities to account for unforeseen losses.

Variables Table:

Variable Meaning Unit Typical Range/Example
L, H Wall Length & Height meters (m) L: 5-50m, H: 1.5-5m
Lb, Hb, Wb TuffBlock Dimensions meters (m) Lb: 0.6, Hb: 0.2, Wb: 0.4
Mc Mortar Coverage per Block square meters (m²) 0.005 – 0.02
Cv Concrete Volume per Block cubic meters (m³) 0.003 – 0.015
Block Cost Cost per TuffBlock $ $4.00 – $8.00
Mortar Cost per m³ Cost of Mortar $ $100 – $200
Concrete Cost per m³ Cost of Concrete $ $150 – $250
Wp Wastage Percentage % 2% – 10%

Mathematical Formulas Used:

  • Total Wall Area = L × H
  • Block Surface Area = Lb × Hb
  • Blocks per m² = 1 / (Lb × Hb)
  • Raw Total Blocks = Total Wall Area × Blocks per m²
  • Total Blocks = Raw Total Blocks × (1 + Wp/100)
  • Total Mortar Volume = Total Blocks × Mc
  • Total Concrete Volume = Total Blocks × Cv
  • Block Cost = Total Blocks × Block Cost
  • Mortar Cost = Total Mortar Volume × Mortar Cost per m³
  • Concrete Cost = Total Concrete Volume × Concrete Cost per m³
  • Total Project Cost = Block Cost + Mortar Cost + Concrete Cost

Practical Examples (Real-World Use Cases)

Example 1: Residential Foundation Wall

A homeowner is building a foundation wall for a new garage extension using TuffBlocks. The dimensions are:

  • Wall Length: 15 meters
  • Wall Height: 1.2 meters
  • TuffBlock Dimensions: Length 0.6m, Height 0.2m, Width 0.4m
  • Mortar Coverage per Block: 0.01 m²
  • Concrete Volume per Block: 0.005 m³
  • Costs: Block $5.50, Mortar $150/m³, Concrete $180/m³
  • Wastage: 5%

Calculator Output & Interpretation:

$1,555.20
Total Wall Area
18 m²
Blocks per m²
8.33
Total Blocks Needed
158
Total Mortar Volume
1.58 m²
Total Concrete Volume
0.79 m³
Block Cost
$869.00
Mortar Cost
$237.00
Concrete Cost
$142.20
Total Estimated Cost
$1,248.20

This estimation covers the primary materials for the foundation wall. Ensure you factor in labor, rebar, damp-proofing, and other associated construction costs.

The calculator indicates approximately 158 TuffBlocks are needed, along with 1.58 m² of mortar and 0.79 m³ of concrete (after wastage). The total estimated material cost is around $1,248.20. This figure helps the homeowner budget effectively for the foundation phase.

Example 2: Retaining Wall Project

A landscaper is constructing a 2-meter high retaining wall with a total length of 25 meters using TuffBlocks. The project requires structural integrity, so cavities will be filled with concrete and rebar.

  • Wall Length: 25 meters
  • Wall Height: 2 meters
  • TuffBlock Dimensions: Length 0.6m, Height 0.2m, Width 0.4m
  • Mortar Coverage per Block: 0.01 m²
  • Concrete Volume per Block: 0.005 m³
  • Costs: Block $6.00, Mortar $160/m³, Concrete $190/m³
  • Wastage: 7%

Calculator Output & Interpretation:

$3,298.10
Total Wall Area
50 m²
Blocks per m²
8.33
Total Blocks Needed
433
Total Mortar Volume
4.33 m²
Total Concrete Volume
2.17 m³
Block Cost
$2,598.00
Mortar Cost
$692.80
Concrete Cost
$412.30
Total Estimated Cost
$3,703.10

This total cost includes blocks, mortar, and concrete, accounting for 7% wastage. Labor, drainage, and reinforcement costs are additional considerations.

For this retaining wall, the TuffBlock calculator estimates needing around 433 blocks, 4.33 m² of mortar, and 2.17 m³ of concrete. The total material cost comes to approximately $3,703.10. This detailed breakdown allows the landscaper to provide an accurate quote and procure the correct materials, minimizing project delays and budget overruns.

How to Use This TuffBlock Calculator

Using the TuffBlock calculator is straightforward. Follow these simple steps to get your material and cost estimates:

  1. Enter Project Dimensions:
    • Input the total Wall Length (in meters) of your project.
    • Input the desired total Wall Height (in meters).
  2. Specify TuffBlock Details:
    • Enter the TuffBlock Length, Height, and Width (all in meters) for the specific blocks you are using. These are critical for calculating surface area and quantity per square meter.
  3. Provide Material Estimates:
    • Enter the estimated Mortar Coverage per block (in m²). This represents the mortar needed for the joints.
    • Enter the estimated Concrete Volume per block (in m³). This is the amount needed to fill the block cavities. Consult TuffBlock manufacturer guidelines or engineering specifications for accurate values.
  4. Input Cost Information:
    • Enter the Cost per TuffBlock.
    • Enter the Mortar Cost per cubic meter (m³).
    • Enter the Concrete Cost per cubic meter (m³).
  5. Add Wastage Factor:
    • Input the Wastage Percentage (e.g., 5%) to account for cuts, breakage, and on-site handling losses.
  6. Click "Calculate Materials": Once all fields are populated, press the calculate button. The results will update instantly.
  7. Review the Results:
    • Primary Highlighted Result: This is your Total Estimated Project Cost.
    • Intermediate Values: These show key figures like Total Wall Area, Blocks per m², Total Blocks Needed, Total Mortar Volume, and Total Concrete Volume.
    • Cost Summary: A breakdown of costs for blocks, mortar, and concrete individually.
    • Formula Explanation: Details the calculations performed.
    • Material Quantity Table: Provides a clear list of materials, quantities, unit costs, and total costs.
    • Chart: Visually represents the cost distribution among different materials.
  8. Use the Buttons:
    • Reset: Clears all inputs and results, returning to default values.
    • Copy Results: Copies the main result, intermediate values, and key assumptions to your clipboard for easy sharing or documentation.

Decision-Making Guidance:

The results from the TuffBlock calculator are essential for informed decision-making. Use the total estimated cost to:

  • Compare quotes from different suppliers.
  • Adjust project scope if the budget is tight.
  • Plan your procurement schedule effectively.
  • Understand the financial implications of material choices.
Remember, this calculator focuses on material costs. Always factor in labor, equipment, permits, and other project-specific expenses for a comprehensive budget.

Key Factors That Affect TuffBlock Results

Several factors can significantly influence the accuracy of your TuffBlock calculator results and the overall project cost. Understanding these is crucial for effective planning:

  1. Project Dimensions Accuracy:

    Financial Reasoning: The most direct impact. Inaccurate wall length or height measurements will lead to incorrect estimations of total area, subsequently affecting the quantity of every material needed. Overestimating wastes money; underestimating leads to costly delays and additional orders.

  2. TuffBlock Specifications:

    Financial Reasoning: Different TuffBlock models or manufacturers may have slightly varying dimensions. Using incorrect block dimensions in the calculator affects the calculation of blocks per square meter and consequently the total block count. This can also impact the mortar and concrete volumes required for joints and cavities.

  3. Mortar and Concrete Requirements:

    Financial Reasoning: The specified mortar coverage per block and concrete volume per cavity are critical assumptions. If these are underestimated (e.g., for decorative joints or partial filling), the calculated costs for mortar and concrete will be too low. Conversely, overestimating leads to higher initial material expenses, though it might prevent shortages.

  4. Wastage Percentage:

    Financial Reasoning: Setting an appropriate wastage percentage is vital. Too low, and you risk running out of materials, incurring rush order fees and potential delays. Too high, and you overspend on materials that may not be used. Factors like site accessibility, builder experience, and block complexity influence the optimal wastage rate.

  5. Material Unit Costs:

    Financial Reasoning: Fluctuations in the market price of TuffBlocks, cement, sand, aggregate (for mortar and concrete), and delivery charges directly alter the total project cost. The calculator relies on current or projected costs; variations can lead to budget discrepancies. Shopping around for suppliers can yield significant savings.

  6. Labor Costs and Efficiency:

    Financial Reasoning: While not directly calculated by this tool, labor is often the largest project expense. The efficiency of the installation crew impacts project timeline and overall cost. TuffBlocks can reduce labor time due to their interlocking nature, but complex designs or challenging site conditions can increase it. The calculator doesn't account for this, so it must be added separately.

  7. Structural Requirements (Rebar & Grouting):

    Financial Reasoning: For structural or load-bearing walls, specific engineering requirements for reinforcement (rebar) and specialized grout filling may be necessary. The calculator estimates basic concrete fill; significant additional costs for denser grout mixes or extensive rebar can arise, impacting the overall budget substantially. These must be budgeted separately.

  8. Site Conditions and Accessibility:

    Financial Reasoning: Difficult site access can increase delivery costs for materials and potentially slow down the construction process, adding to labor expenses. Uneven terrain might require additional foundation preparation, increasing costs beyond the simple wall calculation.

Frequently Asked Questions (FAQ)

Q1: What is the standard size of a TuffBlock?

A: Standard TuffBlock dimensions vary by manufacturer, but common sizes are around 600mm long, 200mm high, and 400mm wide. Always confirm the exact dimensions with your supplier for accurate calculations.

Q2: Does the calculator include costs for reinforcement (rebar)?

A: No, this TuffBlock calculator primarily focuses on estimating the quantity and cost of the blocks, mortar, and concrete fill. Costs for rebar, reinforcing mesh, and specialized grouts required for structural integrity must be budgeted separately based on engineering specifications.

Q3: How accurate is the wastage percentage input?

A: The wastage percentage is an estimate. A typical range is 5-10%, but actual wastage can vary based on the complexity of the design, the skill of the installers, and site conditions. It's advisable to consult with your builder for a more precise wastage estimate.

Q4: Can this calculator be used for non-wall structures like pools or tanks?

A: While the core calculations for surface area and block quantity are applicable, structures like pools or tanks often have unique structural requirements (e.g., waterproofing, specialized reinforcement, precise cavity filling). This calculator provides a starting point, but a detailed engineering plan is essential for such projects.

Q5: What does "Mortar Coverage per Block" mean?

A: This refers to the estimated volume or surface area of mortar used to join one TuffBlock to others. It accounts for the mortar spread on the contact surfaces. The value can vary depending on the joint thickness and block design.

Q6: Should I round up the number of TuffBlocks?

A: The calculator already includes a wastage percentage. However, for ordering, it's often practical to round up to the nearest full block or pallet if the calculated number is very close to a threshold, especially considering that wastage can sometimes exceed the estimated percentage.

Q7: How is the "Total Estimated Cost" calculated?

A: It's the sum of the calculated costs for TuffBlocks, mortar, and concrete, based on the quantities derived from your inputs and the unit costs you provide. It does not include labor, delivery fees, or other construction expenses.

Q8: Can I use this calculator if I'm using TuffBlocks with insulation panels?

A: This calculator focuses on the structural blockwork. If you are integrating insulation panels, you would need to adjust your project dimensions or consider the insulation separately. The block quantity calculation assumes standard block-to-block construction.

Q9: What if my TuffBlocks have different dimensions than the example?

A: That's why we have input fields for TuffBlock Length, Height, and Width! Simply enter the precise dimensions of the blocks you are using, and the calculator will adjust all subsequent calculations accordingly. Always use the exact manufacturer specifications for best results.

var chartInstance = null; function validateInput(value, id, min, max, errorElementId, fieldName) { var errorElement = document.getElementById(errorElementId); errorElement.classList.remove('visible'); // Hide error by default if (isNaN(value) || value === "") { errorElement.textContent = fieldName + " cannot be empty."; errorElement.classList.add('visible'); return false; } if (value max) { errorElement.textContent = fieldName + " cannot be greater than " + max + "."; errorElement.classList.add('visible'); return false; } return true; } function formatCurrency(amount) { return "$" + Number(amount).toFixed(2); } function formatNumber(number, decimals = 2) { return Number(number).toFixed(decimals); } function calculateTuffBlocks() { // Get input values var wallLength = parseFloat(document.getElementById('wallLength').value); var wallHeight = parseFloat(document.getElementById('wallHeight').value); var blockWidth = parseFloat(document.getElementById('blockWidth').value); var blockHeight = parseFloat(document.getElementById('blockHeight').value); var blockLength = parseFloat(document.getElementById('blockLength').value); var mortarCoverage = parseFloat(document.getElementById('mortarCoverage').value); var concreteVolume = parseFloat(document.getElementById('concreteVolume').value); var blockCost = parseFloat(document.getElementById('blockCost').value); var mortarCostPerM3 = parseFloat(document.getElementById('mortarCostPerM3').value); var concreteCostPerM3 = parseFloat(document.getElementById('concreteCostPerM3').value); var wastagePercentage = parseFloat(document.getElementById('wastagePercentage').value); // Input Validation var isValid = true; if (!validateInput(wallLength, 'wallLength', 0.1, 1000, 'wallLengthError', 'Wall Length')) isValid = false; if (!validateInput(wallHeight, 'wallHeight', 0.1, 100, 'wallHeightError', 'Wall Height')) isValid = false; if (!validateInput(blockWidth, 'blockWidth', 0.01, 5, 'blockWidthError', 'Block Width')) isValid = false; if (!validateInput(blockHeight, 'blockHeight', 0.01, 5, 'blockHeightError', 'Block Height')) isValid = false; if (!validateInput(blockLength, 'blockLength', 0.01, 5, 'blockLengthError', 'Block Length')) isValid = false; if (!validateInput(mortarCoverage, 'mortarCoverage', 0.0001, 1, 'mortarCoverageError', 'Mortar Coverage')) isValid = false; if (!validateInput(concreteVolume, 'concreteVolume', 0.0001, 1, 'concreteVolumeError', 'Concrete Volume')) isValid = false; if (!validateInput(blockCost, 'blockCost', 0.1, 1000, 'blockCostError', 'Cost per TuffBlock')) isValid = false; if (!validateInput(mortarCostPerM3, 'mortarCostPerM3', 1, 10000, 'mortarCostPerM3Error', 'Mortar Cost')) isValid = false; if (!validateInput(concreteCostPerM3, 'concreteCostPerM3', 1, 10000, 'concreteCostPerM3Error', 'Concrete Cost')) isValid = false; if (!validateInput(wastagePercentage, 'wastagePercentage', 0, 50, 'wastagePercentageError', 'Wastage Percentage')) isValid = false; if (!isValid) { document.getElementById('resultsContainer').classList.add('hidden'); return; } // Calculations var totalWallArea = wallLength * wallHeight; var blockSurfaceArea = blockLength * blockHeight; var blocksPerSqrM = 1 / blockSurfaceArea; var rawTotalBlocks = totalWallArea * blocksPerSqrM; var totalBlocks = rawTotalBlocks * (1 + wastagePercentage / 100); var totalMortarVolume = totalBlocks * mortarCoverage; var totalConcreteVolume = totalBlocks * concreteVolume; var totalBlockCost = totalBlocks * blockCost; var totalMortarCost = totalMortarVolume * mortarCostPerM3; var totalConcreteCost = totalConcreteVolume * concreteCostPerM3; var totalProjectCost = totalBlockCost + totalMortarCost + totalConcreteCost; // Display Results document.getElementById('resultsContainer').classList.remove('hidden'); document.getElementById('primaryResult').textContent = formatCurrency(totalProjectCost); document.getElementById('totalWallArea').textContent = formatNumber(totalWallArea, 2) + ' m²'; document.getElementById('blocksPerSqrM').textContent = formatNumber(blocksPerSqrM, 2); document.getElementById('totalBlocks').textContent = formatNumber(totalBlocks, 0); document.getElementById('totalMortarVolume').textContent = formatNumber(totalMortarVolume, 2) + ' m²'; document.getElementById('totalConcreteVolume').textContent = formatNumber(totalConcreteVolume, 3) + ' m³'; document.getElementById('totalBlockCost').textContent = formatCurrency(totalBlockCost); document.getElementById('totalMortarCost').textContent = formatCurrency(totalMortarCost); document.getElementById('totalConcreteCost').textContent = formatCurrency(totalConcreteCost); document.getElementById('totalProjectCost').textContent = formatCurrency(totalProjectCost); // Redundant but good for clarity // Update Table document.getElementById('tableBlocksQty').textContent = formatNumber(totalBlocks, 0); document.getElementById('tableBlockUnitCost').textContent = formatCurrency(blockCost); document.getElementById('tableBlocksTotalCost').textContent = formatCurrency(totalBlockCost); document.getElementById('tableMortarQty').textContent = formatNumber(totalMortarVolume, 2) + ' m²'; document.getElementById('tableMortarUnitCost').textContent = formatCurrency(mortarCostPerM3) + '/m³'; document.getElementById('tableMortarTotalCost').textContent = formatCurrency(totalMortarCost); document.getElementById('tableConcreteQty').textContent = formatNumber(totalConcreteVolume, 3) + ' m³'; document.getElementById('tableConcreteUnitCost').textContent = formatCurrency(concreteCostPerM3) + '/m³'; document.getElementById('tableConcreteTotalCost').textContent = formatCurrency(totalConcreteCost); // Update Chart updateChart(totalBlockCost, totalMortarCost, totalConcreteCost); } function updateChart(blockCost, mortarCost, concreteCost) { var ctx = document.getElementById('costChart').getContext('2d'); if (chartInstance) { chartInstance.destroy(); // Destroy previous chart instance if it exists } var totalCost = blockCost + mortarCost + concreteCost; var blockPercentage = totalCost > 0 ? (blockCost / totalCost) * 100 : 0; var mortarPercentage = totalCost > 0 ? (mortarCost / totalCost) * 100 : 0; var concretePercentage = totalCost > 0 ? (concreteCost / totalCost) * 100 : 0; chartInstance = new Chart(ctx, { type: 'bar', // Changed to bar chart for better cost distribution view data: { labels: ['Blocks', 'Mortar', 'Concrete'], datasets: [{ label: 'Cost ($)', data: [blockCost, mortarCost, concreteCost], backgroundColor: [ 'rgba(0, 74, 153, 0.6)', // Primary color for blocks 'rgba(108, 117, 125, 0.6)', // Secondary color for mortar 'rgba(40, 167, 69, 0.6)' // Success color for concrete ], borderColor: [ 'rgba(0, 74, 153, 1)', 'rgba(108, 117, 125, 1)', 'rgba(40, 167, 69, 1)' ], borderWidth: 1 }] }, options: { responsive: true, maintainAspectRatio: false, scales: { y: { beginAtZero: true, title: { display: true, text: 'Cost ($)' } } }, plugins: { legend: { display: false // Labels are on the x-axis }, tooltip: { callbacks: { label: function(context) { var label = context.dataset.label || "; if (label) { label += ': '; } if (context.parsed.y !== null) { label += formatCurrency(context.parsed.y); } return label; } } } } } }); } function resetCalculator() { document.getElementById('wallLength').value = '10'; document.getElementById('wallHeight').value = '2.5'; document.getElementById('blockWidth').value = '0.4'; document.getElementById('blockHeight').value = '0.2'; document.getElementById('blockLength').value = '0.6'; document.getElementById('mortarCoverage').value = '0.01'; document.getElementById('concreteVolume').value = '0.005'; document.getElementById('blockCost').value = '5.50'; document.getElementById('mortarCostPerM3').value = '150'; document.getElementById('concreteCostPerM3').value = '180'; document.getElementById('wastagePercentage').value = '5'; // Clear errors var errorElements = document.querySelectorAll('.error-message'); for (var i = 0; i < errorElements.length; i++) { errorElements[i].textContent = ''; errorElements[i].classList.remove('visible'); } // Hide results and clear them document.getElementById('resultsContainer').classList.add('hidden'); document.getElementById('primaryResult').textContent = ''; var valueElements = document.querySelectorAll('.results-container .value'); for (var i = 0; i < valueElements.length; i++) { valueElements[i].textContent = ''; } // Clear table cells var tableCellElements = document.querySelectorAll('#materialTableBody td'); for (var i = 0; i < tableCellElements.length; i++) { tableCellElements[i].textContent = ''; } // Clear chart if (chartInstance) { chartInstance.destroy(); chartInstance = null; } } function copyResults() { var resultsContainer = document.getElementById('resultsContainer'); if (resultsContainer.classList.contains('hidden')) { alert("Please calculate the results first."); return; } var primaryResult = document.getElementById('primaryResult').innerText; var intermediateValues = document.querySelectorAll('.results-container .intermediate-item'); var costSummaryItems = document.querySelectorAll('.results-container .intermediate-results:nth-of-type(2) .intermediate-item'); var assumptions = []; assumptions.push("Primary Result: " + primaryResult); intermediateValues.forEach(function(item) { assumptions.push(item.querySelector('.label').innerText + ": " + item.querySelector('.value').innerText); }); costSummaryItems.forEach(function(item) { assumptions.push(item.querySelector('.label').innerText + ": " + item.querySelector('.value').innerText); }); // Add key input parameters for context assumptions.push("\n— Key Inputs —"); assumptions.push("Wall Length: " + document.getElementById('wallLength').value + " m"); assumptions.push("Wall Height: " + document.getElementById('wallHeight').value + " m"); assumptions.push("Block Dimensions: " + document.getElementById('blockLength').value + "m (L) x " + document.getElementById('blockHeight').value + "m (H) x " + document.getElementById('blockWidth').value + "m (W)"); assumptions.push("Wastage: " + document.getElementById('wastagePercentage').value + "%"); var textToCopy = assumptions.join('\n'); navigator.clipboard.writeText(textToCopy).then(function() { alert('Results copied to clipboard!'); }).catch(function(err) { console.error('Failed to copy: ', err); alert('Failed to copy results. Please copy manually.'); }); } // Initial calculation on load if default values are present document.addEventListener('DOMContentLoaded', function() { calculateTuffBlocks(); // Ensure chart canvas is created if it doesn't exist yet var canvas = document.getElementById('costChart'); if (!canvas) { var chartContainer = document.getElementById('chartContainer'); canvas = document.createElement('canvas'); canvas.id = 'costChart'; chartContainer.appendChild(canvas); } // Call updateChart with initial values after ensuring canvas exists var blockCost = parseFloat(document.getElementById('blockCost').value || 0); var mortarCostPerM3 = parseFloat(document.getElementById('mortarCostPerM3').value || 0); var concreteCostPerM3 = parseFloat(document.getElementById('concreteCostPerM3').value || 0); var totalBlocks = parseFloat(document.getElementById('totalBlocks').textContent.replace(/[^0-9.-]+/g,"")) || 0; // Extract number from text var totalMortarVolume = parseFloat(document.getElementById('totalMortarVolume').textContent.replace(/[^0-9.-]+/g,"")) || 0; var totalConcreteVolume = parseFloat(document.getElementById('totalConcreteVolume').textContent.replace(/[^0-9.-]+/g,"")) || 0; updateChart(totalBlocks * blockCost, totalMortarVolume * mortarCostPerM3, totalConcreteVolume * concreteCostPerM3); }); // Add Chart.js script dynamically var script = document.createElement('script'); script.src = 'https://cdn.jsdelivr.net/npm/chart.js@3.9.1/dist/chart.min.js'; // Use a specific version for stability script.onload = function() { console.log("Chart.js loaded successfully."); // Recalculate and update chart after Chart.js is loaded calculateTuffBlocks(); }; script.onerror = function() { console.error("Failed to load Chart.js. Charts will not be available."); }; document.head.appendChild(script);

Leave a Comment