Calculation of Reorder Point

Reorder Point Calculator & Guide | Calculate Inventory Needs :root { –primary-color: #004a99; –success-color: #28a745; –background-color: #f8f9fa; –text-color: #333; –border-color: #ddd; –shadow-color: rgba(0, 0, 0, 0.1); } body { font-family: 'Segoe UI', Tahoma, Geneva, Verdana, sans-serif; line-height: 1.6; color: var(–text-color); background-color: var(–background-color); margin: 0; padding: 0; display: flex; flex-direction: column; align-items: center; min-height: 100vh; } .container { width: 100%; max-width: 960px; margin: 20px auto; padding: 20px; background-color: #fff; border-radius: 8px; box-shadow: 0 4px 8px var(–shadow-color); display: flex; flex-direction: column; align-items: center; } header { width: 100%; background-color: var(–primary-color); color: white; padding: 20px 0; text-align: center; margin-bottom: 20px; border-radius: 8px 8px 0 0; } header h1 { margin: 0; font-size: 2.5em; font-weight: 600; } h2, h3 { color: var(–primary-color); margin-top: 30px; margin-bottom: 15px; font-weight: 600; } .calculator-section { width: 100%; display: flex; flex-direction: column; align-items: center; margin-bottom: 40px; border-bottom: 1px solid var(–border-color); padding-bottom: 30px; } .calculator-section:last-of-type { border-bottom: none; margin-bottom: 0; padding-bottom: 0; } .calc-header { text-align: center; margin-bottom: 20px; } .calc-header h2 { margin-bottom: 5px; } .calc-header p { font-size: 0.95em; color: #555; } .loan-calc-container { width: 100%; max-width: 600px; background-color: #fdfdfd; padding: 30px; border-radius: 8px; box-shadow: inset 0 2px 4px rgba(0,0,0,.05); display: flex; flex-direction: column; gap: 20px; } .input-group { display: flex; flex-direction: column; gap: 5px; width: 100%; } .input-group label { font-weight: bold; font-size: 0.9em; color: var(–primary-color); margin-bottom: 2px; } .input-group input[type="number"], .input-group input[type="text"], .input-group select { padding: 12px 15px; border: 1px solid var(–border-color); border-radius: 4px; font-size: 1em; width: 100%; box-sizing: border-box; transition: border-color 0.3s ease; } .input-group input:focus, .input-group select:focus { border-color: var(–primary-color); outline: none; box-shadow: 0 0 0 2px rgba(0, 74, 153, 0.2); } .input-group .helper-text { font-size: 0.8em; color: #777; margin-top: 5px; } .input-group .error-message { color: #dc3545; font-size: 0.8em; margin-top: 5px; min-height: 1.2em; display: block; } .button-group { display: flex; justify-content: space-between; gap: 10px; margin-top: 25px; } button { padding: 12px 20px; border: none; border-radius: 5px; cursor: pointer; font-size: 1em; font-weight: 600; transition: background-color 0.3s ease, transform 0.2s ease; flex-grow: 1; } button.primary { background-color: var(–primary-color); color: white; } button.primary:hover { background-color: #003b7d; transform: translateY(-1px); } button.secondary { background-color: #6c757d; color: white; } button.secondary:hover { background-color: #5a6268; transform: translateY(-1px); } button.reset { background-color: #ffc107; color: black; } button.reset:hover { background-color: #e0a800; transform: translateY(-1px); } .results-container { width: 100%; max-width: 600px; margin-top: 30px; padding: 30px; background-color: var(–primary-color); color: white; border-radius: 8px; box-shadow: 0 4px 8px rgba(0, 74, 153, 0.3); text-align: center; display: flex; flex-direction: column; gap: 15px; } .primary-result { font-size: 2.5em; font-weight: bold; margin: 0; padding: 10px 15px; background-color: rgba(255, 255, 255, 0.2); border-radius: 5px; } .intermediate-results { display: flex; flex-wrap: wrap; justify-content: center; gap: 20px; margin-top: 10px; } .intermediate-results div { text-align: center; padding: 5px 10px; } .intermediate-results span { display: block; font-weight: bold; font-size: 1.3em; } .intermediate-results p { font-size: 0.9em; opacity: 0.9; margin: 0; } .formula-explanation { font-size: 0.9em; margin-top: 15px; opacity: 0.85; padding: 10px; border-top: 1px solid rgba(255, 255, 255, 0.2); } .chart-container, .table-container { width: 100%; max-width: 600px; margin-top: 30px; padding: 30px; background-color: #fff; border-radius: 8px; box-shadow: 0 4px 8px var(–shadow-color); } .chart-container canvas { width: 100% !important; height: auto; } table { width: 100%; border-collapse: collapse; margin-top: 15px; } th, td { padding: 12px 15px; text-align: left; border-bottom: 1px solid var(–border-color); } th { background-color: var(–primary-color); color: white; font-weight: bold; } tr:nth-child(even) { background-color: #f2f2f2; } caption { font-size: 1.1em; font-weight: bold; color: var(–primary-color); text-align: center; margin-bottom: 15px; caption-side: top; } .article-section { width: 100%; max-width: 960px; margin: 30px auto; padding: 20px; background-color: #fff; border-radius: 8px; box-shadow: 0 4px 8px var(–shadow-color); } .article-section h2 { text-align: center; margin-bottom: 20px; color: var(–primary-color); font-size: 2em; font-weight: 700; } .article-section h3 { margin-top: 25px; margin-bottom: 10px; font-size: 1.5em; color: var(–primary-color); } .article-section p { margin-bottom: 15px; color: #444; } .article-section ul, .article-section ol { margin-left: 20px; margin-bottom: 15px; color: #444; } .article-section li { margin-bottom: 8px; } .faq-item { margin-bottom: 15px; padding: 15px; background-color: #f8f9fa; border-radius: 5px; border-left: 4px solid var(–primary-color); } .faq-item strong { color: var(–primary-color); display: block; margin-bottom: 5px; font-size: 1.1em; } .internal-links { margin-top: 30px; padding-top: 20px; border-top: 1px solid var(–border-color); } .internal-links h3 { text-align: center; margin-bottom: 20px; } .internal-links ul { list-style: none; padding: 0; display: flex; flex-wrap: wrap; justify-content: center; gap: 15px; } .internal-links li { margin-bottom: 10px; } .internal-links a { color: var(–primary-color); text-decoration: none; font-weight: bold; padding: 8px 12px; border: 1px solid var(–primary-color); border-radius: 4px; transition: all 0.3s ease; } .internal-links a:hover { background-color: var(–primary-color); color: white; text-decoration: underline; } footer { width: 100%; text-align: center; padding: 20px; margin-top: 40px; background-color: var(–primary-color); color: white; font-size: 0.9em; border-radius: 0 0 8px 8px; } @media (max-width: 768px) { .container { margin: 10px; padding: 15px; } header h1 { font-size: 2em; } .button-group { flex-direction: column; } button { width: 100%; } .results-container, .chart-container, .table-container { padding: 20px; } .primary-result { font-size: 2em; } .intermediate-results span { font-size: 1.1em; } .article-section { margin: 20px auto; padding: 15px; } }

Reorder Point Calculator

Calculate Your Reorder Point

Determine the optimal stock level to trigger a new order and prevent stockouts.

The average number of days it takes for an order to arrive after it's placed.
The average number of units sold or used per day.
Extra inventory held to buffer against unexpected demand or delays.

Reorder Point = (Average Daily Demand × Average Lead Time) + Safety Stock

Demand During Lead Time

Total Stock Needed

Safety Stock

Reorder Point vs. Actual Inventory Levels
Metric Value Unit
Average Daily Demand Units/Day
Average Lead Time Days
Safety Stock Units
Demand During Lead Time Units
Reorder Point (ROP) Units

What is Reorder Point?

The reorder point (ROP) is a crucial inventory management metric that signals when a specific item's stock level has reached a point where a new order needs to be placed to replenish it. Essentially, it's the minimum quantity of inventory that must be on hand before a replenishment order is initiated. The primary goal of establishing a reorder point is to ensure that a business does not run out of stock while waiting for a new order to arrive, thereby preventing lost sales, customer dissatisfaction, and operational disruptions. Understanding and accurately calculating your reorder point is fundamental to efficient inventory control, balancing the costs of holding inventory against the risks of stockouts.

Who Should Use It?

Any business that holds and manages physical inventory can benefit significantly from calculating and implementing reorder points. This includes, but is not limited to:

  • Retail businesses (clothing stores, electronics shops, grocery stores)
  • E-commerce businesses
  • Manufacturers and assembly plants
  • Wholesalers and distributors
  • Restaurants and food service providers
  • Healthcare facilities (managing medical supplies)
  • Warehousing and logistics operations

Essentially, if you stock items that are sold or used, and you want to avoid the negative consequences of running out, the reorder point is a vital concept to grasp.

Common Misconceptions

Several common misunderstandings surround the reorder point:

  • ROP is a fixed number: While often static for stable demand items, ROP should be reviewed and adjusted as demand, lead times, or safety stock needs change.
  • ROP is the same as minimum stock: Safety stock is a component of the reorder point, but ROP itself is the trigger for ordering, not just the minimum buffer.
  • ROP eliminates all stockouts: While it drastically reduces the likelihood, unexpected events (extreme demand surges, supply chain disruptions) can still lead to stockouts if safety stock is insufficient or lead times unexpectedly lengthen.
  • ROP is only for large businesses: Small businesses can gain immense value from ROP, simplifying inventory management and preventing costly stockouts.

Reorder Point Formula and Mathematical Explanation

The core calculation for the reorder point is relatively straightforward, integrating key variables that represent demand and supply chain timing. The most common formula is:

The Reorder Point Formula

Reorder Point (ROP) = (Average Daily Demand × Average Lead Time) + Safety Stock

Let's break down each component:

Variable Explanations

  • Average Daily Demand (ADD): This is the average number of units of a product sold or consumed per day over a specific period. It smooths out daily fluctuations to provide a stable baseline.
  • Average Lead Time (LT): This is the average time, typically measured in days, from when a replenishment order is placed until the inventory is received and available for use or sale. This includes order processing time, supplier production time, and shipping time.
  • Safety Stock (SS): This is an extra buffer of inventory held to protect against uncertainties in demand and lead time. It acts as a cushion against stockouts caused by unexpected spikes in demand or delays in delivery.

Mathematical Derivation

The first part of the formula, (Average Daily Demand × Average Lead Time), calculates the expected demand during the replenishment period. This is the quantity of stock you expect to sell or use while waiting for your new order to arrive. By setting the reorder point at this level, you theoretically have just enough stock to cover demand until the new inventory is in hand, assuming demand and lead times are perfectly predictable.

However, in reality, demand and lead times are rarely perfectly predictable. This is where Safety Stock comes in. By adding safety stock to the expected demand during lead time, you create a buffer. When the inventory level drops to the calculated Reorder Point, you place a new order. If demand increases or lead time extends, you draw from your safety stock to continue meeting demand until the new order arrives. Thus, the ROP serves as the inventory trigger level that ensures you have enough stock to cover demand during lead time, plus a safety margin.

Variables Table

Key Variables in Reorder Point Calculation
Variable Meaning Unit Typical Range
Average Daily Demand (ADD) Average units sold or consumed per day. Units / Day 1 to thousands (product dependent)
Average Lead Time (LT) Time from order placement to receipt. Days 1 to 90+ days (supplier/product dependent)
Safety Stock (SS) Buffer inventory for uncertainties. Units 0 to 100s (based on variability and service level)
Reorder Point (ROP) Inventory level triggering a new order. Units Calculated value based on inputs
Demand During Lead Time (DDLT) Expected demand while waiting for order. Units Calculated value (ADD * LT)

Practical Examples (Real-World Use Cases)

Example 1: A Small Retail Boutique

A boutique sells an average of 5 trendy scarves per day. The lead time for reordering these scarves from their supplier is typically 4 days. They want to maintain a safety stock of 2 scarves to account for occasional unexpected demand surges or slight shipping delays.

Inputs:

  • Average Daily Demand: 5 units
  • Average Lead Time: 4 days
  • Safety Stock: 2 units

Calculation:

Demand During Lead Time = Average Daily Demand × Average Lead Time = 5 units/day × 4 days = 20 units

Reorder Point = Demand During Lead Time + Safety Stock = 20 units + 2 units = 22 units

Interpretation: The boutique should place a new order for scarves when their inventory level drops to 22 units. This ensures they have enough stock to cover the expected 20 units needed over the 4-day lead time, plus a buffer of 2 units.

Example 2: An E-commerce Warehouse

An online retailer specializing in consumer electronics sells an average of 50 units of a popular charging cable daily. Their supplier has a lead time of 7 days. Due to fluctuating sales and occasional carrier delays, they decide to hold a safety stock of 100 units.

Inputs:

  • Average Daily Demand: 50 units
  • Average Lead Time: 7 days
  • Safety Stock: 100 units

Calculation:

Demand During Lead Time = Average Daily Demand × Average Lead Time = 50 units/day × 7 days = 350 units

Reorder Point = Demand During Lead Time + Safety Stock = 350 units + 100 units = 450 units

Interpretation: When the inventory of charging cables reaches 450 units, the e-commerce warehouse should initiate a replenishment order. This level accounts for the 350 units expected to be sold during the 7-day lead time and provides a crucial 100-unit safety buffer.

How to Use This Reorder Point Calculator

Our Reorder Point Calculator is designed for simplicity and efficiency. Follow these steps to accurately determine your inventory triggers:

Step-by-Step Instructions

  1. Identify Your Product: Focus on one specific product or SKU at a time.
  2. Determine Average Daily Demand: Calculate the average number of units of this product sold or consumed each day. You can typically find this data in your sales records or inventory management system. Enter this value into the "Average Daily Demand" field.
  3. Determine Average Lead Time: Accurately measure the average time, in days, from when you place an order with your supplier until the goods are physically received and ready for use. Enter this into the "Average Lead Time" field.
  4. Set Your Safety Stock: Decide on an appropriate safety stock level. This is your buffer against unpredictable demand or supply chain issues. Consider factors like demand variability, lead time variability, and desired customer service level. Enter this value into the "Safety Stock" field. If you don't need a buffer, enter 0.
  5. Calculate: Click the "Calculate Reorder Point" button.

How to Read Results

The calculator will instantly display:

  • Primary Result (Reorder Point): This is the main number shown in a large, prominent font. It represents the exact inventory level at which you should place a new order for the item.
  • Intermediate Values: You'll see the calculated "Demand During Lead Time" (how much you expect to sell while waiting for the new order) and the "Safety Stock" you entered.
  • Table and Chart: The results are also summarized in a table for easy reference and visualized in a chart comparing expected inventory levels against the reorder point over time.

Decision-Making Guidance

Once you have your Reorder Point (ROP):

  • Monitor Inventory Levels: Regularly check your stock counts for the specific item.
  • Place Orders Promptly: When your inventory count reaches or falls below the calculated ROP, it's time to place a new order with your supplier.
  • Adjust as Needed: Your business environment is dynamic. Periodically review your ROP calculations. If your sales patterns change significantly, your supplier's lead times fluctuate, or your desired service level shifts, recalculate your ROP to ensure it remains optimal.

Using the "Copy Results" button allows you to easily transfer these figures for record-keeping or sharing with your team.

Key Factors That Affect Reorder Point Results

While the formula for reorder point is simple, the accuracy and effectiveness of the result depend heavily on the quality of the input data and external business factors. Here are key elements that influence your ROP:

  1. Demand Variability: This is arguably the most significant factor. If customer demand for a product fluctuates wildly (e.g., seasonal items, promotional effects, unpredictable trends), you'll need a higher safety stock, leading to a higher reorder point. Conversely, stable, predictable demand allows for a lower safety stock and ROP.
  2. Lead Time Variability: Unreliable suppliers or transportation issues can cause lead times to vary significantly. If your lead time is inconsistent, you must increase your safety stock to cover potential delays, thus raising your reorder point. Establishing strong relationships with dependable suppliers is crucial for minimizing this factor.
  3. Desired Service Level: This refers to the probability you want to meet customer demand from stock on hand. A higher desired service level (e.g., 99% probability of not stocking out) requires a larger safety stock and consequently a higher reorder point. Lower service levels might be acceptable for non-critical items or where temporary stockouts have minimal impact.
  4. Inventory Holding Costs: While not directly in the ROP formula, these costs (storage, insurance, obsolescence) influence the safety stock decision. Holding too much inventory based on a high ROP incurs higher carrying costs. Businesses must balance the cost of holding inventory against the cost of stockouts.
  5. Ordering Costs: The cost associated with placing a single order (administrative, shipping fees) influences how frequently you place orders. While ROP determines *when* to order, it works in conjunction with economic order quantity (EOQ) models that determine *how much* to order. Frequent small orders might require a different safety stock strategy than infrequent large orders.
  6. Economic Conditions and Inflation: Broader economic factors can impact both demand (consumer spending) and lead times (supply chain costs, transportation availability). Inflation can increase the cost of goods, making the value of inventory held (including safety stock) more significant. Businesses may need to adjust ROP strategies based on inflationary pressures and market forecasts.
  7. Product Shelf Life and Obsolescence: For perishable goods or items with short product lifecycles (like technology), a high reorder point combined with a long lead time could lead to excess inventory that expires or becomes obsolete before it can be sold. This necessitates careful balancing of ROP with inventory turnover rates.

Frequently Asked Questions (FAQ)

Q1: What is the difference between Reorder Point and Safety Stock?

Safety stock is a buffer of extra inventory held to mitigate stockouts due to demand and lead time variability. The reorder point is the inventory level that triggers the placement of a new order, and it is calculated using demand during lead time plus safety stock. Safety stock is a component *of* the reorder point calculation.

Q2: How often should I update my Reorder Point?

It's recommended to review and update your reorder points periodically, typically quarterly or semi-annually. More frequent updates may be necessary if you observe significant changes in demand patterns, supplier performance (lead times), or your business strategy (e.g., changing service level targets).

Q3: Can I use the same reorder point for all my products?

Generally, no. Different products have different sales velocities (demand), lead times, and variability. Each product or SKU should ideally have its own reorder point calculated based on its specific data to optimize inventory management.

Q4: What if my supplier's lead time is highly variable?

If lead time is very inconsistent, you'll need to increase your safety stock significantly to avoid stockouts. This means your reorder point will be higher. Consider working with suppliers to improve reliability or explore alternative suppliers if possible.

Q5: How does seasonality affect my reorder point?

Seasonality means your "Average Daily Demand" will change throughout the year. For seasonal products, you should calculate separate reorder points for different seasons or periods based on the anticipated demand during those times. You may need to adjust lead times as well if supplier capacity changes seasonally.

Q6: What is a "stockout" and why is it bad?

A stockout occurs when you run out of a product and cannot fulfill customer orders. This leads to lost sales, potential loss of customer loyalty, damaged brand reputation, and operational delays if the stockout affects production or other business processes.

Q7: How does the reorder point relate to Economic Order Quantity (EOQ)?

The reorder point tells you *when* to order, while EOQ tells you *how much* to order. They are complementary. You'd typically calculate your ROP to know when to trigger an order and then use EOQ (or another method) to determine the optimal quantity to order at that time to minimize total inventory costs.

Q8: What if I don't have historical data for demand or lead time?

If historical data is unavailable, you'll need to make educated estimates. Start by observing sales and supplier performance closely, and establish an initial, possibly higher, safety stock. As you gather data, refine your estimates and recalculate your reorder points for greater accuracy. It's better to start with an estimate and refine than to not manage inventory triggers at all.

© 2023 Your Company Name. All rights reserved.

var chartInstance = null; // Global variable to hold chart instance function getElement(id) { return document.getElementById(id); } function validateInput(value, id, errorId, min, max, message) { var errorElement = getElement(errorId); if (value === null || value === "") { errorElement.textContent = "This field is required."; return false; } var numValue = parseFloat(value); if (isNaN(numValue)) { errorElement.textContent = "Please enter a valid number."; return false; } if (min !== undefined && numValue max) { errorElement.textContent = message || "Value cannot be more than " + max + "."; return false; } errorElement.textContent = ""; return true; } function calculateReorderPoint() { var leadTimeInput = getElement("leadTime"); var dailyDemandInput = getElement("dailyDemand"); var safetyStockInput = getElement("safetyStock"); var leadTime = parseFloat(leadTimeInput.value); var dailyDemand = parseFloat(dailyDemandInput.value); var safetyStock = parseFloat(safetyStockInput.value); var isValid = true; isValid = validateInput(leadTimeInput.value, "leadTime", "leadTimeError", 0, Infinity, "Lead time must be a non-negative number.") && isValid; isValid = validateInput(dailyDemandInput.value, "dailyDemand", "dailyDemandError", 0, Infinity, "Daily demand must be a non-negative number.") && isValid; isValid = validateInput(safetyStockInput.value, "safetyStock", "safetyStockError", 0, Infinity, "Safety stock must be a non-negative number.") && isValid; if (!isValid) { resetResults(); return; } var demandDuringLeadTime = dailyDemand * leadTime; var reorderPoint = demandDuringLeadTime + safetyStock; var resultsContainer = getElement("resultsContainer"); var primaryResult = getElement("primaryResult"); var demandDuringLeadTimeDisplay = getElement("demandDuringLeadTime").querySelector("span"); var totalStockNeededDisplay = getElement("totalStockNeeded").querySelector("span"); var safetyStockBufferDisplay = getElement("safetyStockBuffer").querySelector("span"); primaryResult.textContent = Math.round(reorderPoint); demandDuringLeadTimeDisplay.textContent = Math.round(demandDuringLeadTime); totalStockNeededDisplay.textContent = Math.round(reorderPoint); // ROP is the total stock needed to trigger reorder safetyStockBufferDisplay.textContent = Math.round(safetyStock); resultsContainer.style.display = "flex"; updateTable(dailyDemand, leadTime, safetyStock, demandDuringLeadTime, reorderPoint); updateChart(leadTime, reorderPoint, safetyStock); } function updateTable(dailyDemand, leadTime, safetyStock, demandDuringLeadTime, reorderPoint) { getElement("tableDailyDemand").textContent = Math.round(dailyDemand); getElement("tableLeadTime").textContent = Math.round(leadTime); getElement("tableSafetyStock").textContent = Math.round(safetyStock); getElement("tableDemandDuringLeadTime").textContent = Math.round(demandDuringLeadTime); getElement("tableReorderPoint").textContent = Math.round(reorderPoint); } function updateChart(leadTime, reorderPoint, safetyStock) { var ctx = getElement("reorderPointChart").getContext("2d"); if (chartInstance) { chartInstance.destroy(); } // Generate data points for the chart var dataPoints = 30; // Number of days to display var labels = []; var inventoryLevels = []; var reorderPointLevels = []; var safetyStockLevels = []; for (var i = 0; i < dataPoints; i++) { labels.push("Day " + (i + 1)); var currentDemand = parseFloat(getElement("dailyDemand").value) || 0; var currentLeadTime = parseFloat(getElement("leadTime").value) || 0; var currentSafetyStock = parseFloat(getElement("safetyStock").value) || 0; // Simulate inventory level decreasing daily until reorder point is hit, then reset + lead time buffer var simulatedInventory = Math.max(0, reorderPoint – (currentDemand * (i + 1))); inventoryLevels.push(simulatedInventory); // Reorder point is constant reorderPointLevels.push(reorderPoint); // Safety stock level is also constant as a baseline safetyStockLevels.push(currentSafetyStock); } chartInstance = new Chart(ctx, { type: 'line', data: { labels: labels, datasets: [{ label: 'Simulated Inventory Level', data: inventoryLevels, borderColor: 'rgba(0, 74, 153, 1)', backgroundColor: 'rgba(0, 74, 153, 0.2)', fill: true, tension: 0.1 }, { label: 'Reorder Point (ROP)', data: reorderPointLevels, borderColor: 'rgba(255, 193, 7, 1)', borderDash: [5, 5], fill: false, tension: 0 }, { label: 'Safety Stock Level', data: safetyStockLevels, borderColor: 'rgba(40, 167, 69, 1)', borderDash: [2, 2], fill: false, tension: 0 }] }, options: { responsive: true, maintainAspectRatio: true, scales: { y: { beginAtZero: true, title: { display: true, text: 'Units' } }, x: { title: { display: true, text: 'Time (Days)' } } }, plugins: { tooltip: { mode: 'index', intersect: false, }, legend: { position: 'top', } } } }); } function copyResults() { var primaryResult = getElement("primaryResult").textContent; var demandDuringLeadTime = getElement("demandDuringLeadTime").querySelector("span").textContent; var totalStockNeeded = getElement("totalStockNeeded").querySelector("span").textContent; var safetyStock = getElement("safetyStockBuffer").querySelector("span").textContent; var tableDailyDemand = getElement("tableDailyDemand").textContent; var tableLeadTime = getElement("tableLeadTime").textContent; var tableSafetyStock = getElement("tableSafetyStock").textContent; var tableDemandDuringLeadTime = getElement("tableDemandDuringLeadTime").textContent; var tableReorderPoint = getElement("tableReorderPoint").textContent; var assumptions = "Assumptions:\n" + "Average Daily Demand: " + tableDailyDemand + " units\n" + "Average Lead Time: " + tableLeadTime + " days\n" + "Safety Stock: " + tableSafetyStock + " units\n"; var resultsText = "— Reorder Point Calculation Results —\n\n" + "Reorder Point (ROP): " + primaryResult + " units\n" + "Demand During Lead Time: " + demandDuringLeadTime + " units\n" + "Total Stock Needed (ROP): " + totalStockNeeded + " units\n" + "Safety Stock Buffer: " + safetyStock + " units\n\n" + assumptions; // Copy to clipboard navigator.clipboard.writeText(resultsText).then(function() { alert("Results copied to clipboard!"); }, function(err) { console.error("Could not copy text: ", err); alert("Failed to copy results. Please copy manually."); }); } function resetResults() { getElement("primaryResult").textContent = "–"; getElement("demandDuringLeadTime").querySelector("span").textContent = "–"; getElement("totalStockNeeded").querySelector("span").textContent = "–"; getElement("safetyStockBuffer").querySelector("span").textContent = "–"; getElement("resultsContainer").style.display = "none"; updateTable("–", "–", "–", "–", "–"); if (chartInstance) { chartInstance.destroy(); chartInstance = null; } var canvas = getElement("reorderPointChart"); var ctx = canvas.getContext("2d"); ctx.clearRect(0, 0, canvas.width, canvas.height); } function resetCalculator() { getElement("leadTime").value = ""; getElement("dailyDemand").value = ""; getElement("safetyStock").value = "0"; getElement("leadTimeError").textContent = ""; getElement("dailyDemandError").textContent = ""; getElement("safetyStockError").textContent = ""; resetResults(); } // Initial load setup (optional, can be triggered by button click) document.addEventListener('DOMContentLoaded', function() { // Optionally, load default values or trigger calculation if inputs exist on page load // Example: If you want to pre-fill some values: // getElement('leadTime').value = 7; // getElement('dailyDemand').value = 15; // getElement('safetyStock').value = 5; // calculateReorderPoint(); // Ensure canvas is present before trying to update chart on load var canvas = getElement("reorderPointChart"); if (canvas) { var ctx = canvas.getContext("2d"); ctx.font = "16px Arial"; ctx.textAlign = "center"; ctx.fillText("Enter values above to see chart.", canvas.width/2, canvas.height/2); } });

Leave a Comment