Refinance Calculator Rates

.calc-container { background-color: #f9f9f9; padding: 30px; border-radius: 8px; box-shadow: 0 4px 6px rgba(0,0,0,0.05); margin-bottom: 40px; } .calc-title { text-align: center; color: #2c3e50; margin-bottom: 25px; font-size: 24px; font-weight: 700; } .input-group { margin-bottom: 20px; display: flex; flex-direction: column; } .input-row { display: flex; gap: 20px; margin-bottom: 15px; flex-wrap: wrap; } .col-half { flex: 1; min-width: 200px; } .calc-label { display: block; margin-bottom: 8px; font-weight: 600; color: #444; font-size: 14px; } .calc-input { width: 100%; padding: 12px; border: 1px solid #ddd; border-radius: 4px; font-size: 16px; box-sizing: border-box; transition: border-color 0.3s; } .calc-input:focus { border-color: #3498db; outline: none; } .calc-btn { background-color: #e67e22; color: white; border: none; padding: 15px 30px; font-size: 18px; font-weight: bold; border-radius: 4px; cursor: pointer; width: 100%; transition: background 0.3s; text-transform: uppercase; letter-spacing: 1px; } .calc-btn:hover { background-color: #d35400; } .result-box { margin-top: 30px; background: #fff; border-left: 5px solid #27ae60; padding: 20px; display: none; } .result-title { font-size: 18px; color: #27ae60; margin-bottom: 15px; font-weight: bold; border-bottom: 1px solid #eee; padding-bottom: 10px; } .result-row { display: flex; justify-content: space-between; margin-bottom: 12px; font-size: 16px; border-bottom: 1px dotted #eee; padding-bottom: 5px; } .result-val { font-weight: bold; color: #333; } .article-content { line-height: 1.6; color: #333; } .article-content h2 { color: #2c3e50; margin-top: 30px; font-size: 22px; } .article-content h3 { color: #e67e22; font-size: 18px; margin-top: 20px; } .article-content ul { padding-left: 20px; } .article-content li { margin-bottom: 10px; } .highlight-box { background: #e8f6f3; padding: 15px; border-radius: 4px; margin: 20px 0; border: 1px solid #d1f2eb; }
Concrete Slab & Footing Calculator
Estimated Materials Needed
Total Volume (Cubic Yards):
Total Volume (Cubic Feet):
Pre-Mix Bags Required:
80lb Bags (Quikrete/Sakrete):
60lb Bags:
Estimated Truck Cost:
function calculateConcrete() { // Get input values var length = parseFloat(document.getElementById('concLength').value); var width = parseFloat(document.getElementById('concWidth').value); var depth = parseFloat(document.getElementById('concDepth').value); var waste = parseFloat(document.getElementById('concWaste').value); var price = parseFloat(document.getElementById('concPrice').value); // Validation if (isNaN(length) || isNaN(width) || isNaN(depth)) { alert("Please enter valid numbers for Length, Width, and Thickness."); return; } if (isNaN(waste)) { waste = 0; } // Logic: Calculate Cubic Feet first // Formula: Length (ft) * Width (ft) * (Depth (in) / 12) var cubicFeetRaw = length * width * (depth / 12); // Add Waste Percentage var wasteFactor = 1 + (waste / 100); var totalCubicFeet = cubicFeetRaw * wasteFactor; // Convert to Cubic Yards (27 cubic feet in 1 cubic yard) var totalCubicYards = totalCubicFeet / 27; // Calculate Bags // Approx yields: 80lb bag = 0.60 cu ft, 60lb bag = 0.45 cu ft var bags80 = totalCubicFeet / 0.60; var bags60 = totalCubicFeet / 0.45; // Update DOM document.getElementById('resFeet').innerHTML = totalCubicFeet.toFixed(2) + " ft³"; document.getElementById('resYards').innerHTML = totalCubicYards.toFixed(2) + " yd³"; document.getElementById('resBags80').innerHTML = Math.ceil(bags80) + " bags"; document.getElementById('resBags60').innerHTML = Math.ceil(bags60) + " bags"; // Calculate Cost if price is provided if (!isNaN(price) && price > 0) { var totalCost = totalCubicYards * price; document.getElementById('resCost').innerHTML = "$" + totalCost.toFixed(2); document.getElementById('costRow').style.display = 'flex'; } else { document.getElementById('costRow').style.display = 'none'; } // Show result box document.getElementById('resultBox').style.display = 'block'; }

How to Calculate Concrete for Slabs and Footings

Planning a new driveway, patio, or walkway? Accurately estimating the amount of concrete you need is the first step to a successful project. Ordering too little leads to expensive emergency deliveries and "cold joints" in your slab, while ordering too much is a waste of money.

The Concrete Formula

Concrete is measured by volume, specifically in Cubic Yards (often just called "yards"). The basic math formula to determine the volume of a rectangular slab is:

Length (ft) × Width (ft) × Thickness (ft) = Cubic Feet
Then divide by 27 to get Cubic Yards.

Note: Since thickness is usually measured in inches, remember to divide the inches by 12 before multiplying.

Standard Thickness Guides

  • 4 Inches: Standard for residential sidewalks, patios, and garage floors (light vehicle traffic).
  • 5-6 Inches: Recommended for driveways holding heavier vehicles, RV pads, or areas with poor soil conditions.
  • 8+ Inches: Heavy-duty commercial aprons or structural footings.

Why You Need a Waste Margin

Professional contractors never order the exact mathematical amount. Site conditions vary—your subgrade might be slightly uneven, forms might bow out under pressure, or spillage may occur during the pour. We recommend adding a 5% to 10% safety margin to your total volume to ensure you don't run short.

Bags vs. Ready-Mix Truck

When should you mix it yourself versus calling a truck?

  • Use Bags (60lb/80lb): For small projects requiring less than 1 cubic yard (approx. 45 bags of 80lb mix). Ideal for setting fence posts or small landing pads.
  • Order a Truck: For anything over 1 cubic yard. Mixing 50+ bags by hand is labor-intensive and makes it difficult to achieve a consistent finish before the concrete begins to set.

FAQ: How many bags make a yard?

To make one cubic yard of concrete, you generally need:

  • 45 bags of 80lb concrete mix.
  • 60 bags of 60lb concrete mix.

Leave a Comment