.bac-calculator-container { font-family: -apple-system, BlinkMacSystemFont, "Segoe UI", Roboto, Oxygen-Sans, Ubuntu, Cantarell, "Helvetica Neue", sans-serif; max-width: 800px; margin: 20px auto; padding: 30px; border: 1px solid #e1e4e8; border-radius: 12px; background-color: #ffffff; box-shadow: 0 4px 15px rgba(0,0,0,0.05); } .bac-calculator-container h2 { color: #1a202c; margin-top: 0; border-bottom: 2px solid #3182ce; padding-bottom: 10px; } .bac-input-group { margin-bottom: 20px; } .bac-input-group label { display: block; font-weight: 600; margin-bottom: 8px; color: #4a5568; } .bac-input-group input { width: 100%; padding: 12px; border: 1px solid #cbd5e0; border-radius: 6px; font-size: 16px; box-sizing: border-box; } .bac-btn { background-color: #3182ce; color: white; padding: 15px 25px; border: none; border-radius: 6px; cursor: pointer; font-size: 18px; font-weight: bold; width: 100%; transition: background-color 0.2s; } .bac-btn:hover { background-color: #2b6cb0; } #bac-result-area { margin-top: 25px; padding: 20px; background-color: #f7fafc; border-radius: 8px; display: none; } .bac-result-val { font-size: 28px; font-weight: 800; color: #2d3748; margin: 10px 0; } .bac-content { line-height: 1.6; color: #2d3748; margin-top: 40px; } .bac-content h3 { color: #2b6cb0; margin-top: 25px; } .bac-example { background: #fffaf0; border-left: 4px solid #ed8936; padding: 15px; margin: 20px 0; }

Project Budget at Completion (BAC) Calculator

Total Budget at Completion (BAC):
$0.00

What is Budget at Completion (BAC)?

In project management and Earned Value Management (EVM), Budget at Completion (BAC) represents the total sum of all budgets established for the work to be performed. It is the baseline against which project performance is measured.

BAC is determined during the planning phase of the project and remains constant unless a formal change request is approved. It includes the sum of all work package budgets, planning packages, and the management or contingency reserves allocated to the project scope.

The BAC Formula

While the simplest way to view BAC is the sum of all project costs, it is calculated as:

BAC = (Labor Costs + Material Costs + Fixed Costs) + Contingency Reserve

Example Calculation

Scenario: A software development project has the following estimates:

  • Labor: $60,000 (Developers and Designers)
  • Materials: $5,000 (Cloud hosting and licenses)
  • Subcontractors: $10,000 (Security audit firm)
  • Contingency: 15% (Risk buffer)

Step 1: Sum base costs = $60,000 + $5,000 + $10,000 = $75,000.

Step 2: Apply contingency = $75,000 * 1.15 = $86,250.

In this case, your BAC is $86,250.

Why BAC Matters in EVM

BAC is essential for calculating other critical project metrics:

  • Variance at Completion (VAC): BAC – EAC (Estimate at Completion).
  • Estimate to Complete (ETC): How much more money is needed.
  • To-Complete Performance Index (TCPI): The efficiency required to finish within the BAC.
function calculateBAC() { var labor = parseFloat(document.getElementById("laborCost").value); var material = parseFloat(document.getElementById("materialCost").value); var fixed = parseFloat(document.getElementById("fixedCost").value); var contingencyPercent = parseFloat(document.getElementById("contingency").value); // Validate inputs if (isNaN(labor)) labor = 0; if (isNaN(material)) material = 0; if (isNaN(fixed)) fixed = 0; if (isNaN(contingencyPercent)) contingencyPercent = 0; var baseTotal = labor + material + fixed; var contingencyAmount = baseTotal * (contingencyPercent / 100); var finalBAC = baseTotal + contingencyAmount; var display = document.getElementById("bacDisplay"); var breakdown = document.getElementById("bacBreakdown"); var resultArea = document.getElementById("bac-result-area"); if (finalBAC > 0) { display.innerHTML = "$" + finalBAC.toLocaleString(undefined, {minimumFractionDigits: 2, maximumFractionDigits: 2}); breakdown.innerHTML = "Base Costs: $" + baseTotal.toLocaleString() + " | Reserve: $" + contingencyAmount.toLocaleString(); resultArea.style.display = "block"; } else { alert("Please enter valid cost figures to calculate the budget."); resultArea.style.display = "none"; } }