Effective Annual Interest Rate Financial Calculator

.cc-row { display: flex; flex-wrap: wrap; gap: 20px; margin-bottom: 15px; } .cc-col { flex: 1; min-width: 200px; } .cc-label { display: block; font-weight: bold; margin-bottom: 5px; color: #333; } .cc-input { width: 100%; padding: 10px; border: 1px solid #ccc; border-radius: 4px; box-sizing: border-box; font-size: 16px; } .cc-btn { background-color: #d35400; color: white; border: none; padding: 12px 20px; font-size: 18px; font-weight: bold; cursor: pointer; border-radius: 4px; width: 100%; transition: background 0.3s; } .cc-btn:hover { background-color: #e67e22; } .cc-result-box { background: #fff; padding: 20px; border-left: 5px solid #d35400; margin-top: 20px; display: none; box-shadow: 0 2px 5px rgba(0,0,0,0.1); } .cc-res-row { display: flex; justify-content: space-between; border-bottom: 1px solid #eee; padding: 10px 0; } .cc-res-label { color: #555; } .cc-res-value { font-weight: bold; color: #2c3e50; } .cc-h2 { color: #2c3e50; border-bottom: 2px solid #d35400; padding-bottom: 10px; margin-top: 40px; } .cc-h3 { color: #d35400; margin-top: 25px; } .cc-p { line-height: 1.6; color: #444; margin-bottom: 15px; } .cc-list { padding-left: 20px; line-height: 1.6; color: #444; }

Concrete Slab Calculator

Estimate cubic yards and pre-mix bags for your project

Estimated Materials Needed

*Includes a calculated 5% waste margin for spillage and uneven subgrade.

Total Volume (Cubic Yards):
Total Volume (Cubic Feet):
60lb Pre-Mix Bags:
80lb Pre-Mix Bags:
function calculateConcrete() { var len = document.getElementById("slabLength").value; var wid = document.getElementById("slabWidth").value; var thk = document.getElementById("slabThickness").value; var resultBox = document.getElementById("resultsArea"); // Validate Input if (len === "" || wid === "" || thk === "") { alert("Please fill in all fields (Length, Width, and Thickness)."); return; } var lengthFt = parseFloat(len); var widthFt = parseFloat(wid); var thickIn = parseFloat(thk); if (isNaN(lengthFt) || isNaN(widthFt) || isNaN(thickIn) || lengthFt <= 0 || widthFt <= 0 || thickIn <= 0) { alert("Please enter valid positive numbers."); return; } // Calculation Logic // 1. Convert thickness to feet var thickFt = thickIn / 12; // 2. Calculate Cubic Feet var cubicFeet = lengthFt * widthFt * thickFt; // 3. Add 5% Waste Margin var totalCubicFeet = cubicFeet * 1.05; // 4. Calculate Cubic Yards (27 cubic feet per yard) var cubicYards = totalCubicFeet / 27; // 5. Calculate Bags // Standard Yield: 80lb bag ~= 0.60 cu ft, 60lb bag ~= 0.45 cu ft var bags80 = Math.ceil(totalCubicFeet / 0.60); var bags60 = Math.ceil(totalCubicFeet / 0.45); // Display Results document.getElementById("resYards").innerText = cubicYards.toFixed(2) + " yd³"; document.getElementById("resFeet").innerText = totalCubicFeet.toFixed(2) + " ft³"; document.getElementById("resBags60").innerText = bags60 + " Bags"; document.getElementById("resBags80").innerText = bags80 + " Bags"; // Show results div resultBox.style.display = "block"; }

How to Calculate Concrete for Slabs and Patios

Accurately estimating the amount of concrete needed for a home improvement project is critical to avoiding shortages mid-pour or wasting money on excess materials. Whether you are pouring a patio, a driveway, or footings, the math relies on determining the total volume of the space in cubic yards.

The Concrete Formula

The basic formula to calculate concrete volume is: Length x Width x Thickness. However, because concrete is sold by the cubic yard (yd³) but dimensions are often measured in feet and inches, conversion is required.

  • Step 1: Convert the thickness from inches to feet by dividing by 12 (e.g., 4 inches ÷ 12 = 0.33 feet).
  • Step 2: Multiply Length (ft) x Width (ft) x Thickness (ft) to get Cubic Feet.
  • Step 3: Divide the total Cubic Feet by 27 to convert to Cubic Yards.

Pre-Mix Bags vs. Ready-Mix Truck

For smaller projects (typically under 2 cubic yards), using pre-mix bags (like Quikrete or Sakrete) is often more cost-effective.

  • 80lb Bags: A standard 80lb bag yields approximately 0.60 cubic feet of cured concrete. You need about 45 bags to make one cubic yard.
  • 60lb Bags: A 60lb bag yields approximately 0.45 cubic feet. You need about 60 bags to make one cubic yard.

For projects requiring more than 2-3 yards, ordering a ready-mix truck is usually preferred to ensure consistency and save physical labor.

Why Include a Waste Margin?

Our calculator automatically adds a 5% safety margin to the total. This accounts for:

  • Spillage during the pour.
  • Uneven subgrade or gravel base depth.
  • Settling of the concrete forms.

Running out of concrete during a pour can result in a "cold joint," which weakens the slab structurally and ruins the visual finish. It is always safer to order slightly more than the exact mathematical volume.

Leave a Comment