Simple Interest Rate Calculator Online

Concrete Calculator: Slab, Bags & Yards Estimator .conc-calc-container { max-width: 800px; margin: 0 auto; font-family: -apple-system, BlinkMacSystemFont, "Segoe UI", Roboto, Helvetica, Arial, sans-serif; color: #333; background: #fff; border: 1px solid #e0e0e0; border-radius: 8px; padding: 20px; box-shadow: 0 4px 6px rgba(0,0,0,0.05); } .conc-header { text-align: center; margin-bottom: 25px; border-bottom: 2px solid #fca311; padding-bottom: 15px; } .conc-header h2 { margin: 0; color: #14213d; font-size: 24px; } .conc-grid { display: grid; grid-template-columns: 1fr 1fr; gap: 20px; } .conc-input-group { margin-bottom: 15px; } .conc-input-group label { display: block; margin-bottom: 5px; font-weight: 600; font-size: 14px; } .conc-input-group input, .conc-input-group select { width: 100%; padding: 10px; border: 1px solid #ccc; border-radius: 4px; font-size: 16px; box-sizing: border-box; } .conc-input-group .unit-label { font-size: 12px; color: #666; margin-top: 2px; } .conc-btn { grid-column: 1 / -1; background-color: #14213d; color: white; padding: 15px; border: none; border-radius: 4px; font-size: 18px; font-weight: bold; cursor: pointer; transition: background 0.3s; width: 100%; margin-top: 10px; } .conc-btn:hover { background-color: #fca311; color: #000; } .conc-results { margin-top: 30px; padding: 20px; background-color: #f8f9fa; border-radius: 6px; border-left: 5px solid #fca311; display: none; } .conc-result-row { display: flex; justify-content: space-between; margin-bottom: 10px; padding-bottom: 10px; border-bottom: 1px solid #eee; } .conc-result-row:last-child { border-bottom: none; margin-bottom: 0; } .conc-result-label { font-weight: 600; color: #555; } .conc-result-value { font-weight: bold; color: #14213d; font-size: 18px; } .conc-bag-highlight { background: #e5e5e5; padding: 10px; border-radius: 4px; margin-top: 5px; text-align: center; font-weight: bold; } /* Article Styling */ .conc-article { max-width: 800px; margin: 40px auto; font-family: inherit; line-height: 1.6; color: #444; } .conc-article h2 { color: #14213d; border-bottom: 1px solid #ddd; padding-bottom: 10px; } .conc-article h3 { color: #fca311; margin-top: 25px; } .conc-article ul { margin-bottom: 20px; } .conc-article li { margin-bottom: 8px; } .conc-warning { background-color: #fff3cd; border: 1px solid #ffeeba; padding: 15px; border-radius: 4px; margin: 20px 0; font-size: 0.95em; } @media (max-width: 600px) { .conc-grid { grid-template-columns: 1fr; } }

Concrete Slab Calculator

Estimate cubic yards and pre-mix bags needed for your project.

Standard slab is 4 inches
0% (Perfect Pour) 5% (Standard) 10% (Irregular Shape) 15% (Rough Grade)
Total Volume Required: 0 Cubic Yards
Volume in Cubic Feet: 0 cu ft
Pre-Mix Bags Required:
80lb Bags
0
60lb Bags
0
Estimated Bag Cost: $0.00

How to Calculate Concrete for Slabs and Footings

Planning a patio, driveway, or shed foundation requires accurate measurements to ensure you purchase the right amount of material. Concrete is measured in cubic yards when ordered from a ready-mix truck, or in bags (60lb or 80lb) when mixing it yourself for smaller projects.

The Concrete Formula

To calculate the volume of concrete needed for a rectangular slab, use the following steps:

  1. Convert all dimensions to feet. If your depth is in inches, divide by 12. For example, a 4-inch slab is 0.33 feet deep.
  2. Calculate Cubic Feet: Multiply Length × Width × Depth.
  3. Calculate Cubic Yards: Divide the total Cubic Feet by 27 (since there are 27 cubic feet in one cubic yard).
Pro Tip: Always include a margin of error (waste factor). Spillage, uneven subgrades, and form settling can require 5-10% more concrete than the perfect mathematical volume.

Bags vs. Ready-Mix Truck

When should you buy bags, and when should you call a truck?

  • Use Bags (Pre-mix): For projects requiring less than 1 cubic yard (approx. 45 bags of 80lb mix). This is ideal for fence posts, small walkways, or equipment pads.
  • Order a Truck: For projects over 1 cubic yard. Mixing more than 50 bags by hand is labor-intensive and makes it difficult to achieve a consistent cure across the slab.

Bag Yields

Different bag sizes yield different volumes of cured concrete:

  • 80lb Bag: Yields approximately 0.60 cubic feet.
  • 60lb Bag: Yields approximately 0.45 cubic feet.

Our calculator above uses these standard yield rates combined with your selected waste factor to ensure you don't run out of material mid-pour.

function calculateConcrete() { // 1. Get Input Values var lenStr = document.getElementById("concLength").value; var widStr = document.getElementById("concWidth").value; var depStr = document.getElementById("concDepth").value; var wasteStr = document.getElementById("concWaste").value; var priceStr = document.getElementById("concPrice").value; // 2. Parse Floats var length = parseFloat(lenStr); var width = parseFloat(widStr); var depth = parseFloat(depStr); var wastePercent = parseFloat(wasteStr); var pricePerBag = parseFloat(priceStr); // 3. Validation if (isNaN(length) || isNaN(width) || isNaN(depth) || length <= 0 || width <= 0 || depth 0) { totalCost = bags80 * pricePerBag; costDisplay = "$" + totalCost.toFixed(2); } // 5. Display Results document.getElementById("resVolumeYards").innerText = totalVolumeYards.toFixed(2) + " Cubic Yards"; document.getElementById("resVolumeFeet").innerText = totalVolumeFeet.toFixed(2) + " cu ft"; document.getElementById("resBags80").innerText = bags80; document.getElementById("resBags60").innerText = bags60; document.getElementById("resCost").innerText = costDisplay; // Show result container document.getElementById("concResult").style.display = "block"; }

Leave a Comment