Site Cost Calculator

Site Cost Calculator: Estimate Your Project Expenses | Expert Guide :root { –primary-color: #004a99; –success-color: #28a745; –background-color: #f8f9fa; –text-color: #333; –border-color: #ccc; –card-background: #fff; –shadow: 0 2px 5px rgba(0,0,0,0.1); } body { font-family: 'Segoe UI', Tahoma, Geneva, Verdana, sans-serif; background-color: var(–background-color); color: var(–text-color); margin: 0; padding: 0; line-height: 1.6; } .container { max-width: 960px; margin: 20px auto; padding: 20px; background-color: var(–card-background); border-radius: 8px; box-shadow: var(–shadow); } header { background-color: var(–primary-color); color: white; padding: 20px 0; text-align: center; border-radius: 8px 8px 0 0; margin-bottom: 20px; } header h1 { margin: 0; font-size: 2.2em; font-weight: 600; } main { padding: 20px; } .calculator-section { margin-bottom: 40px; padding-bottom: 30px; border-bottom: 1px solid #eee; } .calculator-section:last-child { border-bottom: none; } h2, h3 { color: var(–primary-color); margin-top: 0; font-weight: 600; } .loan-calc-container { background-color: var(–card-background); padding: 30px; border-radius: 8px; box-shadow: var(–shadow); margin-bottom: 30px; } .input-group { margin-bottom: 20px; display: flex; flex-direction: column; } .input-group label { display: block; margin-bottom: 8px; font-weight: 500; color: var(–primary-color); } .input-group input[type="number"], .input-group input[type="text"], .input-group select { width: 100%; padding: 10px 12px; border: 1px solid var(–border-color); border-radius: 4px; box-sizing: border-box; font-size: 1rem; } .input-group .helper-text { font-size: 0.85em; color: #666; margin-top: 5px; } .error-message { color: #dc3545; font-size: 0.85em; margin-top: 5px; display: none; /* Hidden by default */ } .button-group { display: flex; gap: 10px; margin-top: 25px; } button { padding: 10px 18px; border: none; border-radius: 4px; cursor: pointer; font-size: 1rem; font-weight: 500; transition: background-color 0.3s ease; } .btn-primary { background-color: var(–primary-color); color: white; } .btn-primary:hover { background-color: #003366; } .btn-secondary { background-color: #6c757d; color: white; } .btn-secondary:hover { background-color: #5a6268; } .btn-reset { background-color: #ffc107; color: #212529; } .btn-reset:hover { background-color: #e0a800; } .results-container { margin-top: 30px; background-color: var(–primary-color); color: white; padding: 25px; border-radius: 8px; box-shadow: var(–shadow); } .results-container h3 { color: white; margin-top: 0; font-size: 1.6em; } .main-result { font-size: 2.4em; font-weight: bold; color: var(–success-color); margin: 15px 0; display: inline-block; padding: 10px 15px; background-color: rgba(255,255,255,0.9); border-radius: 5px; } .intermediate-results, .formula-explanation { margin-top: 20px; font-size: 0.95em; opacity: 0.9; } .intermediate-results p, .formula-explanation p { margin: 8px 0; } .formula-explanation strong { color: var(–success-color); } table { width: 100%; border-collapse: collapse; margin-top: 20px; box-shadow: var(–shadow); border-radius: 4px; overflow: hidden; /* To ensure rounded corners for border-collapsed tables */ } th, td { padding: 12px 15px; text-align: left; border-bottom: 1px solid #ddd; } thead th { background-color: var(–primary-color); color: white; font-weight: 600; } tbody tr:nth-child(even) { background-color: #f2f2f2; } tbody tr:hover { background-color: #e9ecef; } caption { font-size: 1.1em; font-weight: bold; margin-bottom: 10px; color: var(–primary-color); text-align: left; } canvas { display: block; margin: 30px auto 0 auto; border: 1px solid var(–border-color); border-radius: 4px; background-color: var(–card-background); } .chart-container { text-align: center; margin-top: 30px; } .chart-legend { margin-top: 10px; font-size: 0.9em; color: #555; } .chart-legend span { display: inline-block; margin: 0 10px; } .chart-legend .color-box { display: inline-block; width: 12px; height: 12px; margin-right: 5px; vertical-align: middle; } .footer { text-align: center; padding: 20px; margin-top: 40px; font-size: 0.9em; color: #777; } /* Article specific styles */ article { background-color: var(–card-background); padding: 30px; border-radius: 8px; box-shadow: var(–shadow); margin-bottom: 30px; } article h2 { color: var(–primary-color); margin-top: 30px; border-bottom: 2px solid var(–primary-color); padding-bottom: 8px; } article h3 { color: #555; margin-top: 25px; margin-bottom: 15px; } article p { margin-bottom: 15px; } article ul, article ol { margin-bottom: 15px; padding-left: 30px; } article li { margin-bottom: 8px; } .faq-list { list-style: none; padding-left: 0; } .faq-list li { margin-bottom: 20px; padding-bottom: 15px; border-bottom: 1px dashed #ddd; } .faq-list li:last-child { border-bottom: none; } .faq-question { font-weight: bold; color: var(–primary-color); display: block; margin-bottom: 8px; } .internal-links-section ul { list-style: none; padding-left: 0; } .internal-links-section li { margin-bottom: 12px; } .internal-links-section a { color: var(–primary-color); text-decoration: none; font-weight: 500; } .internal-links-section a:hover { text-decoration: underline; } .internal-links-section span { font-size: 0.9em; color: #666; display: block; margin-top: 3px; } /* Utility classes */ .text-center { text-align: center; } .text-primary { color: var(–primary-color); } .bg-primary { background-color: var(–primary-color); } .bg-success { background-color: var(–success-color); } .text-bold { font-weight: bold; } .mb-20 { margin-bottom: 20px; } .mt-20 { margin-top: 20px; } .p-15 { padding: 15px; }

Site Cost Calculator

Estimate Your Project's Site Development Expenses Accurately

Calculate Your Site Costs

Enter the total cost of purchasing the land.
Includes clearing, grading, excavation, demolition.
Costs for connecting water, sewer, electricity, gas, internet.
Building permits, zoning fees, impact fees, etc.
Costs for architects, engineers, surveyors.
Soil testing, Phase I/II ESA, impact studies.
Percentage for unexpected costs (typically 5-20%).

Your Estimated Site Costs

$0

Subtotal Costs: $0

Contingency Amount: $0

Total Estimated Site Cost: $0

Formula: Total Estimated Site Cost = (Land Acquisition Cost + Site Preparation Cost + Utility Connection Cost + Permits and Fees + Architectural & Design Fees + Environmental Assessments) * (1 + Contingency Percentage / 100)

Cost Breakdown Table

Detailed Breakdown of Site Costs
Cost Category Estimated Cost ($)
Land Acquisition 0
Site Preparation 0
Utility Connections 0
Permits & Fees 0
Architectural & Design 0
Environmental Assessments 0
Subtotal 0
Contingency (0%) 0
Total Estimated Site Cost 0

Cost Distribution Chart

What is Site Cost?

Site cost, in the context of real estate development and construction, refers to the total expenses incurred from acquiring a piece of land up to the point where it is ready for building. This encompasses not just the purchase price of the land itself but also all the necessary preparatory work, approvals, and professional services required to make the site suitable for construction. Understanding and accurately estimating site costs is a critical first step for any development project, whether it's a residential home, a commercial building, or an industrial facility. It forms a foundational part of the overall project budget and significantly impacts financial feasibility and profitability. For developers, investors, and even individual homeowners planning to build, a thorough grasp of site costs is essential for effective financial planning and risk management.

Who Should Use a Site Cost Calculator?

A site cost calculator is an invaluable tool for a diverse range of individuals and organizations involved in property development and construction:

  • Property Developers: To assess the viability of potential development projects, budget for land acquisition and preparation, and secure financing.
  • Real Estate Investors: To evaluate the profitability of land investments and understand the total capital required before starting a project.
  • Homebuilders and General Contractors: To provide accurate quotes to clients and manage project budgets effectively.
  • Individual Homeowners: Those planning to build a custom home on a vacant lot need to estimate the costs associated with preparing their land.
  • Architects and Engineers: To advise clients on project feasibility and initial budgeting, incorporating site-specific expenses.
  • Urban Planners and Municipalities: For preliminary assessments of development potential in specific areas.

Common Misconceptions About Site Costs

Several common misunderstandings can lead to budget overruns and project delays:

  • "Site Cost is just the land price": This is the most prevalent misconception. It overlooks the substantial costs of making land ready for construction, which can sometimes exceed the land's purchase price.
  • "All sites are equally easy to develop": Factors like topography, soil conditions, existing structures, and access to utilities vary dramatically, each impacting preparation costs.
  • "Permits are quick and cheap": Navigating zoning laws, obtaining building permits, and paying associated fees can be a complex and costly process, often taking longer than anticipated.
  • "Contingency is optional": Unforeseen issues are common in site development. Failing to budget for a contingency fund (typically 10-20%) leaves projects vulnerable to unexpected expenses.

Accurate estimation using a dedicated site cost calculator helps mitigate these misconceptions and promotes realistic budgeting.

{primary_keyword} Formula and Mathematical Explanation

The core of the site cost calculator lies in its formula, designed to aggregate all direct and indirect expenses associated with preparing a piece of land for construction. It ensures that all foreseeable costs are accounted for, including a buffer for the unexpected.

Step-by-Step Derivation

The total estimated site cost is calculated by summing the individual cost components and then adding a contingency amount. The formula can be broken down as follows:

  1. Sum of Direct Site Costs: This involves adding up the costs of land acquisition, site preparation (clearing, grading, excavation), utility connections (water, sewer, electricity, gas, communications), permits and governmental fees, architectural and engineering design fees, and any required environmental assessments or studies.
  2. Calculate Contingency: A percentage (typically 5-20%) is applied to the sum of direct site costs. This contingency acts as a buffer for unforeseen problems like unexpected soil conditions, permit delays, or changes in regulations.
  3. Total Estimated Site Cost: This is the sum of the direct site costs plus the calculated contingency amount.

Variable Explanations

Let's define the variables used in the site cost calculator:

  • LAC: Land Acquisition Cost
  • SPC: Site Preparation Cost
  • UCC: Utility Connection Cost
  • PF: Permits and Fees
  • ADF: Architectural & Design Fees
  • EA: Environmental Assessments
  • CP%: Contingency Percentage

The Formula

The total estimated site cost is calculated using the following formula:

Total Estimated Site Cost = (LAC + SPC + UCC + PF + ADF + EA) * (1 + CP% / 100)

Variables Table

Site Cost Calculator Variables
Variable Meaning Unit Typical Range
Land Acquisition Cost (LAC) Price paid to purchase the land. $ Highly variable based on location, size, zoning.
Site Preparation Cost (SPC) Costs for grading, clearing, excavation, demolition, soil remediation. $ $10,000 – $100,000+ (can be much higher for complex sites)
Utility Connection Cost (UCC) Expenses to bring water, sewer, electricity, gas, and telecom to the site. $ $5,000 – $50,000+ (depends on distance and availability)
Permits and Fees (PF) Costs for building permits, zoning approvals, impact fees, surveys. $ $1,000 – $20,000+ (varies significantly by municipality)
Architectural & Design Fees (ADF) Payments to architects, engineers, and designers for planning. $ 3% – 15% of construction cost, or fixed fee. For site-related work, could be $5,000 – $50,000+.
Environmental Assessments (EA) Costs for soil testing, environmental impact studies, Phase I/II ESAs. $ $2,000 – $15,000+
Contingency Percentage (CP%) Buffer for unforeseen expenses during site development. % 5% – 20% of direct site costs.

Practical Examples (Real-World Use Cases)

Example 1: Single-Family Home Lot Development

A homeowner purchases a 0.5-acre lot in a suburban area to build a custom house. The costs are estimated as follows:

  • Land Acquisition Cost (LAC): $120,000
  • Site Preparation Cost (SPC): $15,000 (basic grading and tree removal)
  • Utility Connection Cost (UCC): $8,000 (connecting to city water and sewer nearby)
  • Permits and Fees (PF): $4,000 (building permit, zoning verification)
  • Architectural & Design Fees (ADF): $6,000 (for site plan and initial house design integration)
  • Environmental Assessments (EA): $2,500 (basic soil tests)
  • Contingency Percentage (CP%): 10%

Calculation:

Subtotal Costs = $120,000 + $15,000 + $8,000 + $4,000 + $6,000 + $2,500 = $155,500

Contingency Amount = $155,500 * (10 / 100) = $15,550

Total Estimated Site Cost = $155,500 + $15,550 = $171,050

Interpretation: The homeowner should budget approximately $171,050 for the land and its preparation before construction of the house can begin. This figure helps in securing a construction loan and understanding the total investment.

Example 2: Small Commercial Development

A developer is acquiring a 2-acre parcel on the edge of town for a small retail strip mall. The initial estimates are:

  • Land Acquisition Cost (LAC): $400,000
  • Site Preparation Cost (SPC): $75,000 (clearing, grading, minor excavation for foundations)
  • Utility Connection Cost (UCC): $35,000 (extending power lines and water main)
  • Permits and Fees (PF): $18,000 (zoning variance, building permits, traffic study fees)
  • Architectural & Design Fees (ADF): $45,000 (detailed site plan, structural engineering)
  • Environmental Assessments (EA): $7,000 (Phase I ESA, soil compaction tests)
  • Contingency Percentage (CP%): 15%

Calculation:

Subtotal Costs = $400,000 + $75,000 + $35,000 + $18,000 + $45,000 + $7,000 = $580,000

Contingency Amount = $580,000 * (15 / 100) = $87,000

Total Estimated Site Cost = $580,000 + $87,000 = $667,000

Interpretation: The developer estimates that the total cost to acquire and prepare the site will be around $667,000. This figure is crucial for calculating the project's overall return on investment (ROI) and determining lease rates for the retail spaces.

How to Use This Site Cost Calculator

Our Site Cost Calculator is designed for ease of use, providing quick and accurate estimates. Follow these simple steps:

  1. Gather Information: Collect realistic cost estimates for each category: Land Acquisition, Site Preparation, Utility Connections, Permits & Fees, Architectural & Design, and Environmental Assessments. If exact figures aren't available, research local averages or consult professionals.
  2. Input Land Acquisition Cost: Enter the total price paid or budgeted for the land purchase in the first field.
  3. Input Site Preparation Costs: Enter the estimated costs for clearing, grading, excavation, and any necessary demolition or soil work.
  4. Input Utility Connection Costs: Enter the expenses associated with bringing essential utilities (water, sewer, electricity, gas, internet) to the property boundary.
  5. Input Permits and Fees: Add the total estimated cost of all required permits, zoning approvals, and municipal fees.
  6. Input Architectural & Design Fees: Enter the costs for any architects, engineers, surveyors, or designers involved in the site planning and preparation phase.
  7. Input Environmental Assessments: Input the costs for any soil testing, environmental impact studies, or site assessments.
  8. Set Contingency Percentage: Adjust the contingency percentage (default is 10%) based on the complexity and potential risks of your site. Higher risk generally warrants a higher percentage (15-20%).
  9. Click 'Calculate Costs': Once all inputs are entered, click the "Calculate Costs" button.

Reading the Results

The calculator will display:

  • Main Result (Total Estimated Site Cost): This is the highlighted, final figure representing your total projected cost for the site.
  • Subtotal Costs: The sum of all direct costs before contingency.
  • Contingency Amount: The dollar value of the buffer added for unforeseen expenses.
  • Detailed Table: A breakdown of each cost category and the final totals.
  • Chart: A visual representation of how each cost category contributes to the total.

Decision-Making Guidance

Use the results to:

  • Budgeting: Ensure your overall project budget accurately reflects the site expenses.
  • Feasibility Analysis: Determine if the project is financially viable based on the total site cost in relation to potential revenue or property value.
  • Financing: Provide lenders and investors with a clear and well-justified cost estimate.
  • Negotiation: Use your prepared estimates when negotiating with contractors or sellers.

Remember, this calculator provides an estimate. For precise figures, consult with local professionals and obtain detailed quotes.

Key Factors That Affect Site Cost Results

Several critical factors can significantly influence the accuracy of your site cost calculator results and the actual expenses incurred:

  1. Land Topography and Geology: Steep slopes, rocky terrain, poor soil stability (e.g., clay, sand, peat), or high water tables necessitate more extensive and costly site preparation, grading, and foundation work. This directly impacts the Site Preparation Cost (SPC).
  2. Location and Accessibility: Remote locations can increase costs for transportation of materials and labor. Proximity to existing infrastructure (roads, utilities) can reduce Utility Connection Costs (UCC) and Site Preparation Costs (SPC). Urban sites might have higher acquisition costs but potentially lower utility extension expenses.
  3. Zoning Regulations and Entitlements: Obtaining necessary zoning changes, permits, and approvals can be time-consuming and expensive. Unexpected regulatory hurdles or requirements for impact studies can significantly inflate Permits and Fees (PF) and Architectural & Design Fees (ADF).
  4. Existing Conditions on Site: The presence of old structures requiring demolition, hazardous materials (like asbestos or contaminated soil), or protected environmental features (wetlands, endangered species habitats) dramatically increases Site Preparation Costs (SPC) and Environmental Assessment (EA) expenses.
  5. Availability and Proximity of Utilities: If the site is far from existing power lines, water mains, or sewer systems, the cost to extend these services (Utility Connection Cost – UCC) can be substantial. The type and capacity of utilities required also play a role.
  6. Professional Expertise and Due Diligence: Thorough site investigations, accurate surveys, and competent design by architects and engineers are crucial. Skimping on due diligence (e.g., skipping soil tests) can lead to costly surprises later, quickly eroding the contingency fund and increasing the overall site cost. Conversely, engaging experienced professionals early can optimize designs and potentially reduce long-term costs.
  7. Market Conditions and Inflation: The cost of labor, materials, and professional services fluctuates with market demand and inflation rates. A project planned over a long period may see its estimated site costs increase due to economic changes.
  8. Project Scale and Complexity: A larger development or one with unique architectural requirements will naturally incur higher costs for design, permitting, and preparation compared to a smaller, simpler project.

Frequently Asked Questions (FAQ)

What is the biggest variable cost in site development?
The biggest variable cost is often Site Preparation (SPC). It's highly dependent on the existing condition of the land – topography, soil type, vegetation, and any existing structures or contamination. A seemingly simple lot could hide complex geological issues.
How accurate is a site cost calculator?
A site cost calculator provides a valuable estimate based on the inputs provided. Its accuracy depends heavily on the quality and realism of those inputs. For precise budgeting, always consult with local professionals (surveyors, engineers, contractors) and obtain formal quotes.
Can site costs exceed the land purchase price?
Yes, absolutely. In some cases, particularly with challenging terrain, extensive environmental remediation, or complex utility connections, the costs to prepare the land can significantly exceed the initial land acquisition cost. This highlights the importance of thorough due diligence.
What if my actual costs are higher than the calculator's estimate?
This is where the contingency fund comes in. If you've budgeted a contingency (e.g., 10-15%), it should cover most moderate overruns. For significant discrepancies, you may need to re-evaluate the project scope, seek additional funding, or renegotiate contracts.
Do I need an environmental assessment for every site?
It depends on the location, history of the land, and local regulations. Sites with a prior industrial use, unusual soil conditions, or proximity to known environmental hazards often require Phase I Environmental Site Assessments (ESAs) at a minimum. Your local planning department can advise on requirements.
How do utility connection costs vary?
Costs vary based on the distance to existing utility lines, the capacity needed, and the local utility provider's policies. Connecting to municipal sewer and water is typically more expensive than using a well and septic system (though those have their own costs). Bringing electricity to a remote site can also be very costly.
Can I reduce my site costs?
Potential cost reductions include finding land with fewer site preparation challenges, negotiating better land prices, leveraging existing utility connections, or simplifying the site design. Thorough research and professional consultation are key to identifying these opportunities.
What's the difference between site cost and construction cost?
Site cost covers everything needed to get the land ready for building (land purchase, prep, utilities, permits). Construction cost is the expense of building the actual structure(s) on that prepared site (foundation, framing, finishes, etc.). They are distinct but interconnected parts of the total project budget.

© 2023 Your Company Name. All rights reserved.

var chartInstance = null; // Global variable to hold chart instance function formatCurrency(amount) { return "$" + Number(amount).toFixed(2).replace(/\d(?=(\d{3})+\.)/g, '$&,'); } function validateInput(id, min, max) { var inputElement = document.getElementById(id); var errorElement = document.getElementById(id + 'Error'); var value = parseFloat(inputElement.value); errorElement.style.display = 'none'; // Hide previous error if (isNaN(value)) { errorElement.textContent = "Please enter a valid number."; errorElement.style.display = 'block'; return false; } if (value < 0) { errorElement.textContent = "Value cannot be negative."; errorElement.style.display = 'block'; return false; } if (id === 'contingencyPercentage') { if (value 100) { errorElement.textContent = "Percentage must be between 0 and 100."; errorElement.style.display = 'block'; return false; } } return true; } function calculateSiteCosts() { var inputsValid = true; var inputIds = [ 'landAcquisitionCost', 'sitePreparationCost', 'utilityConnectionCost', 'permitsAndFees', 'architecturalDesignFees', 'environmentalAssessments', 'contingencyPercentage' ]; for (var i = 0; i < inputIds.length; i++) { if (!validateInput(inputIds[i])) { inputsValid = false; } } if (!inputsValid) { document.getElementById('results-container').style.display = 'none'; return; } var landAcquisitionCost = parseFloat(document.getElementById('landAcquisitionCost').value) || 0; var sitePreparationCost = parseFloat(document.getElementById('sitePreparationCost').value) || 0; var utilityConnectionCost = parseFloat(document.getElementById('utilityConnectionCost').value) || 0; var permitsAndFees = parseFloat(document.getElementById('permitsAndFees').value) || 0; var architecturalDesignFees = parseFloat(document.getElementById('architecturalDesignFees').value) || 0; var environmentalAssessments = parseFloat(document.getElementById('environmentalAssessments').value) || 0; var contingencyPercentage = parseFloat(document.getElementById('contingencyPercentage').value) || 0; var subtotalCosts = landAcquisitionCost + sitePreparationCost + utilityConnectionCost + permitsAndFees + architecturalDesignFees + environmentalAssessments; var contingencyAmount = subtotalCosts * (contingencyPercentage / 100); var totalEstimatedSiteCost = subtotalCosts + contingencyAmount; document.getElementById('subtotalCosts').textContent = formatCurrency(subtotalCosts); document.getElementById('contingencyAmount').textContent = formatCurrency(contingencyAmount); document.getElementById('totalEstimatedSiteCost').textContent = formatCurrency(totalEstimatedSiteCost); document.getElementById('mainResult').textContent = formatCurrency(totalEstimatedSiteCost); // Update Table document.getElementById('tableLandAcquisitionCost').textContent = formatCurrency(landAcquisitionCost); document.getElementById('tableSitePreparationCost').textContent = formatCurrency(sitePreparationCost); document.getElementById('tableUtilityConnectionCost').textContent = formatCurrency(utilityConnectionCost); document.getElementById('tablePermitsAndFees').textContent = formatCurrency(permitsAndFees); document.getElementById('tableArchitecturalDesignFees').textContent = formatCurrency(architecturalDesignFees); document.getElementById('tableEnvironmentalAssessments').textContent = formatCurrency(environmentalAssessments); document.getElementById('tableSubtotal').textContent = formatCurrency(subtotalCosts); document.getElementById('tableContingencyPercentage').textContent = contingencyPercentage.toFixed(1); document.getElementById('tableContingencyAmount').textContent = formatCurrency(contingencyAmount); document.getElementById('tableTotalCost').textContent = formatCurrency(totalEstimatedSiteCost); // Update Chart updateChart( landAcquisitionCost, sitePreparationCost, utilityConnectionCost, permitsAndFees, architecturalDesignFees, environmentalAssessments, contingencyAmount // Use the calculated contingency amount ); document.getElementById('results-container').style.display = 'block'; } function resetCalculator() { document.getElementById('landAcquisitionCost').value = '150000'; document.getElementById('sitePreparationCost').value = '50000'; document.getElementById('utilityConnectionCost').value = '25000'; document.getElementById('permitsAndFees').value = '10000'; document.getElementById('architecturalDesignFees').value = '30000'; document.getElementById('environmentalAssessments').value = '5000'; document.getElementById('contingencyPercentage').value = '10'; // Clear errors var errorElements = document.querySelectorAll('.error-message'); for (var i = 0; i 0 ? (value / total) * 100 : 0; }); // Update legend labels document.getElementById('legendLand').innerHTML = ' Land Acquisition (' + percentages[0].toFixed(1) + '%)'; document.getElementById('legendPrep').innerHTML = ' Site Prep (' + percentages[1].toFixed(1) + '%)'; document.getElementById('legendUtil').innerHTML = ' Utilities (' + percentages[2].toFixed(1) + '%)'; document.getElementById('legendPermits').innerHTML = ' Permits (' + percentages[3].toFixed(1) + '%)'; document.getElementById('legendDesign').innerHTML = ' Design (' + percentages[4].toFixed(1) + '%)'; document.getElementById('legendEnv').innerHTML = ' Env. Assess. (' + percentages[5].toFixed(1) + '%)'; document.getElementById('legendContingency').innerHTML = ' Contingency (' + percentages[6].toFixed(1) + '%)'; chartInstance = new Chart(ctx, { type: 'bar', // Use bar chart for better comparison of values data: { labels: ['Land', 'Prep', 'Utilities', 'Permits', 'Design', 'Env.', 'Contingency'], datasets: [{ label: 'Estimated Cost ($)', data: dataValues, backgroundColor: [ '#4CAF50', // Land Acquisition '#FF9800', // Site Preparation '#2196F3', // Utility Connection '#9C27B0', // Permits and Fees '#E91E63', // Architectural & Design '#795548', // Environmental Assessments '#f44336' // Contingency ], borderColor: [ '#4CAF50', '#FF9800', '#2196F3', '#9C27B0', '#E91E63', '#795548', '#f44336' ], borderWidth: 1 }] }, options: { responsive: true, maintainAspectRatio: false, scales: { y: { beginAtZero: true, ticks: { callback: function(value) { return formatCurrency(value); } } } }, plugins: { legend: { display: false // Hide default legend, using custom one }, tooltip: { callbacks: { label: function(context) { var label = context.dataset.label || "; if (label) { label += ': '; } if (context.parsed.y !== null) { label += formatCurrency(context.parsed.y); } return label; } } } } } }); } // Initial calculation on load (optional, or triggered by default values) document.addEventListener('DOMContentLoaded', function() { calculateSiteCosts(); // Perform an initial calculation with default values }); // Add Chart.js library dynamically var script = document.createElement('script'); script.src = 'https://cdn.jsdelivr.net/npm/chart.js'; document.head.appendChild(script);